Final Screening Insights

13/05/2020

• For surface display on tray, use upper leds to indicate or app.

• For connection of metal parts, first screw than add isolation material and close with lid.

• For tray rails, use original metal drawer rail, and attach to plastic body.

• Produce outer body from metal and attach all the plastic companents to that.

• For the gap that near by interface, produce form and screw it to the body.

• Examine water discharge containers in drying machines.

• Create indented surfaces for water container.

• Make water container square, and the gap trapezoid to disattachment.

• Make form little bid conical on top and bottom.

• Connect pipes with rider. Creates flanges to attach pipes.

• Make normal opening one lid.

• Attach rubber feet to the connection parts directly. Inner from the unit, not visible.

• Show them in more irregular layouts.

• Make app similar to the product language.

App Content:

1. Menu: share consumption speed

2. Main layout:

3. Notifications: harvest trim water system error plant error

4. Close up: type date state water humadity tempature led type of nutrition

5. Additionla info, to show how to do




Leave a Reply

Your email address will not be published. Required fields are marked *