{"id":49,"date":"2016-08-26T19:59:10","date_gmt":"2016-08-26T19:59:10","guid":{"rendered":"http:\/\/blog.metu.edu.tr\/birgonul\/tr\/?page_id=49"},"modified":"2025-04-18T13:01:02","modified_gmt":"2025-04-18T13:01:02","slug":"arastirma","status":"publish","type":"page","link":"https:\/\/blog.metu.edu.tr\/birgonul\/tr\/arastirma\/","title":{"rendered":"Ara\u015ft\u0131rma"},"content":{"rendered":"<h4 style=\"text-align: center\"><strong>Y\u00d6NET\u0130LEN Y\u00dcKSEK L\u0130SANS TEZLER\u0130<\/strong><\/h4>\n<table style=\"border-color: #000000\" border=\"1\">\n<tbody>\n<tr>\n<td rowspan=\"2\" width=\"39\"><strong>\u00a0<\/strong><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\"><span style=\"color: #cf0101\"><strong>\u00a0<\/strong> <strong>\u00d6\u011frenci Ad\u0131<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\"><span style=\"color: #cf0101\"><strong>Tez Bitirme Tarihi<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"221\"><span style=\"color: #cf0101\"><strong>\u00a0<\/strong> <strong>Tez Ba\u015fl\u0131\u011f\u0131<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"132\"><span style=\"color: #cf014f\"><strong>\u00a0<\/strong> <span style=\"color: #cf0101\"><strong>Tez Y\u00f6neticisi<\/strong><\/span><\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\"><span style=\"color: #cf0101\"><strong>Yard\u0131mc\u0131 Tez Y\u00f6neticisi<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>1<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Jamal Lababidi<\/td>\n<td style=\"text-align: center\" width=\"128\">Kas\u0131m 1988<\/td>\n<td width=\"221\">Concrete construction under different climatic conditions and factors affecting the cost estimate<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>2<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Ramazan \u00c7uhadar<\/td>\n<td style=\"text-align: center\" width=\"128\">\u015eubat 1989<\/td>\n<td width=\"221\">A survey on the construction equipment supply and importation of Turkish overseas contractors upon completion of their contracts<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>3<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Vuslat \u00d6zkaramete<\/td>\n<td style=\"text-align: center\" width=\"128\">\u015eubat 1989<\/td>\n<td width=\"221\">Probabilistic quantity estimation of basic construction items by linear regression method<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>4<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Bassem Jarkas<\/td>\n<td style=\"text-align: center\" width=\"128\">Haziran 1989<\/td>\n<td width=\"221\">A computer program related to some standard earthwork equipments<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>5<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Hakan \u00c7aka<\/td>\n<td style=\"text-align: center\" width=\"128\">Haziran 1989<\/td>\n<td width=\"221\">Linear construction planning technique<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>6<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Tuncer \u015eahin<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">\u015eubat 1991<\/td>\n<td rowspan=\"2\" width=\"221\">Thermal insulation and energy conservation measures for low-cost housing<\/td>\n<td style=\"text-align: center\" width=\"132\">As\u0131m Ye\u011finobal\u0131<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>7<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Ahmet Korkmaz<\/td>\n<td style=\"text-align: center\" width=\"128\">Haziran 1991<\/td>\n<td width=\"221\">A methodology for the evaluation of proposals tendered on the basis of Built-Operate-Transfer model<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>8<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Erta Ta\u015fk\u0131nsoy<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 1991<\/td>\n<td rowspan=\"2\" width=\"221\">The integration of CPM and material management in project management<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Canan Sepil<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>9<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Abdulrezak Nurhussein Mohamed<\/td>\n<td style=\"text-align: center\" width=\"128\">Ocak 1992<\/td>\n<td width=\"221\">Effect of inflation and payment delay on profit margin under unit price contract and the compensation methods<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>10<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Ay\u015fe Sibel Yan\u0131k\u00f6mero\u011flu<\/td>\n<td style=\"text-align: center\" width=\"128\">Ocak 1992<\/td>\n<td width=\"221\">An elastic timing method proposed for construction schedules<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>11<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">\u015eeref Topkaya<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">\u015eubat 1992<\/td>\n<td rowspan=\"2\" width=\"221\">An expert system approach to concrete supervising and pre-cast connections<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Yasemin \u00d6zdo\u011fan<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>12<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Can Erdo\u011fan<\/td>\n<td style=\"text-align: center\" width=\"128\">Eyl\u00fcl 1992<\/td>\n<td width=\"221\">Measures for improving quality and maintaining economy in low-cost housing projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>13<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Abdalla \u00d6mer Mahmud<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 1993<\/td>\n<td rowspan=\"2\" width=\"221\">Critical review of quality and time control aspects in some major Libyan construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">As\u0131m Ye\u011finobal\u0131<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>14<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Arzu Bar\u00e7\u0131n Y\u0131lmaz<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 1993<\/td>\n<td rowspan=\"2\" width=\"221\">A case study on the interaction between time and cost constituents of a mass housing construction project<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Erkan \u015eahmal\u0131<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>15<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Mustafa Tun\u00e7 Erk<\/td>\n<td style=\"text-align: center\" width=\"128\">Ocak 1995<\/td>\n<td width=\"221\">The French model of water distribution, sewage collection and treatment administration under private company management<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>16<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Irmak Renda<\/td>\n<td style=\"text-align: center\" width=\"128\">Haziran 1995<\/td>\n<td width=\"221\">Turkish contracting sector: An organisational survey of Turkish contracting companies<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>17<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Aylin Aslan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 1995<\/td>\n<td rowspan=\"2\" width=\"221\">An evaluation of value management practice in Turkish construction sector<\/td>\n<td style=\"text-align: center\" width=\"132\">Metin Ar\u0131kan<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>18<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Birol Akp\u0131nar<\/td>\n<td style=\"text-align: center\" width=\"128\">Eyl\u00fcl 1995<\/td>\n<td width=\"221\">An expert system approach based on \u015eanl\u0131urfa irrigation tunnel construction experiences<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>19<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">\u0130rfan \u00c7etin<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Ocak 1996<\/td>\n<td rowspan=\"2\" width=\"221\">Current construction quality control systems used in Turkey and suggestions for further improvements<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Nadi Bak\u0131r<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>20<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Deniz Elmas<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 1996<\/td>\n<td rowspan=\"2\" width=\"221\">Risk analysis of construction projects based on unit prices under inflationary conditions<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">As\u0131m Ye\u011finobal\u0131<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>21<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Mehmetcan Topuz<\/td>\n<td style=\"text-align: center\" width=\"128\">Ocak 1996<\/td>\n<td width=\"221\">Time, cost and quality management of mass housing projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>22<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Murat \u015eefik Yazan<\/td>\n<td style=\"text-align: center\" width=\"128\">Ocak 1996<\/td>\n<td width=\"221\">Management of political risks in public non-building construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>23<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Mustafa Kaan<\/td>\n<td style=\"text-align: center\" width=\"128\">Ocak 1996<\/td>\n<td width=\"221\">Economic analysis of multi-stage housing production model<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>24<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">\u00d6. Mutlu Sinman<\/td>\n<td style=\"text-align: center\" width=\"128\">Ocak 1996<\/td>\n<td width=\"221\">An overview of the CIS construction market and guidelines for foreign construction companies<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>25<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">\u0130rem (Dikmen) \u00d6zdo\u011fan<\/td>\n<td style=\"text-align: center\" width=\"128\">Aral\u0131k 1996<\/td>\n<td width=\"221\">Risk management of BOT projects in developing countries<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>26<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Ertan K\u00f6k\u00e7\u00fco\u011flu<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 1997<\/td>\n<td rowspan=\"2\" width=\"221\">Quality management in construction<\/td>\n<td style=\"text-align: center\" width=\"132\">Metin Ar\u0131kan<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>27<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Mehmet Ali Ersar\u0131<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Ocak 1998<\/td>\n<td rowspan=\"2\" width=\"221\">Risk analysis and cost simulation of coastal projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Ay\u015fen Ergin<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>28<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Ay\u015feg\u00fcl Petek Yener<\/td>\n<td style=\"text-align: center\" width=\"128\">Ocak 1998<\/td>\n<td width=\"221\">Risk perception and trends of Turkish construction companies<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>29<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Atilla Yurdakul<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Mart 1998<\/td>\n<td rowspan=\"2\" width=\"221\">CPM (Critical Path Method) applications and problems faced in Turkish construction sector<\/td>\n<td style=\"text-align: center\" width=\"132\">Engin Keyder<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>30<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Ebru G\u00f6k\u00e7ek<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Mart 1998<\/td>\n<td rowspan=\"2\" width=\"221\">Evaluation of the subcontracting system in Turkey<\/td>\n<td style=\"text-align: center\" width=\"132\">Metin Ar\u0131kan<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>31<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Abdulkadir \u00c7evik<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Nisan 1998<\/td>\n<td rowspan=\"2\" width=\"221\">Subcontracting relationship between subcontractors and contractors in Turkish construction sector<\/td>\n<td style=\"text-align: center\" width=\"132\">Metin Ar\u0131kan<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>32<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Dilruba \u00d6zmen<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Kas\u0131m 1998<\/td>\n<td rowspan=\"2\" width=\"221\">Development of a quality assurance system for highways in Turkey<\/td>\n<td style=\"text-align: center\" width=\"132\">Ayhan \u0130nal<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>33<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">\u00c7a\u011flar S\u00fcr\u00fcc\u00fc<\/td>\n<td style=\"text-align: center\" width=\"128\">Aral\u0131k 1998<\/td>\n<td width=\"221\">Investigation of State Procurement Law and amendments necessary to make it consistent with the World Bank practices<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>34<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Mete Metin<\/td>\n<td style=\"text-align: center\" width=\"128\">Aral\u0131k 1998<\/td>\n<td width=\"221\">Performance of Turkish contractors working abroad<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>35<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Derya T\u00fcrk T\u00fcrkan<\/td>\n<td style=\"text-align: center\" width=\"128\">Nisan 1999<\/td>\n<td width=\"221\">ISO 9000 Standards in the Turkish construction industry<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>36<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Sinan \u00d6ztabak<\/td>\n<td style=\"text-align: center\" width=\"128\">\u015eubat 2000<\/td>\n<td width=\"221\">Critical review of construction machinery costs within the context of General Price Analysis<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>37<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Levent \u00c7a\u011fr\u0131 Ogan<\/td>\n<td style=\"text-align: center\" width=\"128\">May\u0131s 2000<\/td>\n<td width=\"221\">Effects of economic recession periods on Turkish construction companies<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>38<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Sibel \u00d6nen<\/td>\n<td style=\"text-align: center\" width=\"128\">May\u0131s 2000<\/td>\n<td width=\"221\">Problems faced by foreign contractors working in Turkey<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>39<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Nilhan \u00d6zkan (Erdal)<\/td>\n<td style=\"text-align: center\" width=\"128\">May\u0131s 2000<\/td>\n<td width=\"221\">Refinement of Benefit Cost analysis results for highway projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>40<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">G\u00f6khan Pi\u015fkin<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">May\u0131s 2000<\/td>\n<td rowspan=\"2\" width=\"221\">A comparative study on the reliability-based risk assessment in project management of coastal structures<\/td>\n<td style=\"text-align: center\" width=\"132\">Ay\u015fen Ergin<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>41<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Burak G\u00fcven\u00e7<\/td>\n<td style=\"text-align: center\" width=\"128\">A\u011fustos 2000<\/td>\n<td width=\"221\">A generic algorithm for multi-mode resource constrained project scheduling<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>42<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">G\u00f6ksu G\u00fcnay<\/td>\n<td style=\"text-align: center\" width=\"128\">May\u0131s 2001<\/td>\n<td width=\"221\">Dispute creation and resolution mechanisms of Turkish construction sector in public projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>43<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Sava\u015f Deren<\/td>\n<td style=\"text-align: center\" width=\"128\">A\u011fustos 2001<\/td>\n<td width=\"221\">Value management approach for the selection of construction materials for the buildings owned by Air Force Command<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>44<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Semiha K\u0131z\u0131lta\u015f<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Kas\u0131m 2002<\/td>\n<td rowspan=\"2\" width=\"221\">Organizational effectiveness in Turkish construction companies: An Artificial Neural Network based prediction model<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>45<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">\u0130smail \u00d6zcenk<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 2002<\/td>\n<td rowspan=\"2\" width=\"221\">Marketing in the Turkish construction industry<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>46<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Sami Umut Artuk<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 2002<\/td>\n<td rowspan=\"2\" width=\"221\">An innovation management model for construction companies: Case studies from the Turkish construction industry<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>47<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Tunca Atao\u011flu<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 2002<\/td>\n<td rowspan=\"2\" width=\"221\">An organizational learning framework as a driver of organizational performance of Turkish construction companies<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>48<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Ebru \u00c7anga<\/td>\n<td style=\"text-align: center\" width=\"128\">Aral\u0131k 2002<\/td>\n<td width=\"221\">Impact of construction management graduate education on professional life<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>49<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Beliz \u00d6zorhon<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Nisan 2004<\/td>\n<td rowspan=\"2\" width=\"221\">Organizational memory in construction companies: A Case-Based Reasoning model as an organizational learning tool<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>50<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Tuncay Demirel<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Nisan 2005<\/td>\n<td rowspan=\"2\" width=\"221\">An expert system for the quantification of fault rates in construction fall accidents<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>51<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">A. Arif Ergin<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Temmuz 2005<\/td>\n<td rowspan=\"2\" width=\"221\">Determination of contingency for international construction projects during bidding stage<\/td>\n<td style=\"text-align: center\" width=\"132\">R\u0131fat S\u00f6nmez<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>52<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Ergun Usta<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">A\u011fustos 2005<\/td>\n<td rowspan=\"2\" width=\"221\">Comparison of international federation of consulting engineers and general specification for public works contracts from risk management perspective<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>53<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Ali \u00d6zge Ilgar<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Ekim 2005<\/td>\n<td rowspan=\"2\" width=\"221\">Quantification of acceleration claims: a simplified approach<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>54<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Arif Erdem Ar\u0131kan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Kas\u0131m 2005<\/td>\n<td rowspan=\"2\" width=\"221\">Development of a risk management decision support system for international construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>55<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Ahmet Kemal G\u00fcr<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 2005<\/td>\n<td rowspan=\"2\" width=\"221\">Case based decision support system for bid markup estimation of international construction projects at the tender stage<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>56<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Asl\u0131 Ak\u00e7amete<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 2006<\/td>\n<td rowspan=\"2\" width=\"221\">Country risk assessment in the construction industry<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>57<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Caner Ana\u00e7<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">\u015eubat 2007<\/td>\n<td rowspan=\"2\" width=\"221\">Development of a risk assessment tool for post-project appraisal<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>58<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Amani Suliman Bu-Qammaz<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Haziran 2007<\/td>\n<td rowspan=\"2\" width=\"221\">Risk assessment of international construction projects using the analytic network process<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>59<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">G\u00fczide Atasoy<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Temmuz 2007<\/td>\n<td rowspan=\"2\" width=\"221\">Using cognitive maps for modeling project success<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>60<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Nurdan E\u011filmezer \u015eap\u00e7\u0131<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Temmuz 2007<\/td>\n<td rowspan=\"2\" width=\"221\">Organizational decline and bankruptcy prediction model for the Turkish construction companies<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>61<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">K\u00f6ksal Eren<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 2007<\/td>\n<td rowspan=\"2\" width=\"221\">Critical success factors for partnering in the Turkish construction industry<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>62<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">G\u00fclbin \u00d6zcan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Temmuz 2008<\/td>\n<td rowspan=\"2\" width=\"221\">A generic risk and vulnerability assessment framework for international construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>63<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">G\u00fcl\u015fah Fidan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">A\u011fustos 2008<\/td>\n<td rowspan=\"2\" width=\"221\">A risk and vulnerability ontology for construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>64<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Tanyeli G\u00fcne\u015f<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 2008<\/td>\n<td rowspan=\"2\" width=\"221\">Developing a strategic information system for construction companies<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>65<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Muhammet Alper Yi\u011fit<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">\u015eubat 2009<\/td>\n<td rowspan=\"2\" width=\"221\">Contract management behavior of Turkish construction companies in international projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>66<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Ahmet Hamdi \u00d6zer<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Temmuz 2009<\/td>\n<td rowspan=\"2\" width=\"221\">Development of an activity based assessment tool using integrated duration- cost influence network<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>67 <\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Eren Cangul<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">\u015eubat 2010<\/td>\n<td rowspan=\"2\" width=\"221\">Development of an expert system for the quantification of fault rates in traffic accidents<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">S. Osman Acar<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>68<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">\u00d6zlem Yavuzy\u0131lmaz<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">May\u0131s 2010<\/td>\n<td rowspan=\"2\" width=\"221\">Institutionalization of construction firms: Turkish contractors\u2019 case<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>69<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">K\u0131van\u00e7 Karaka\u015f<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">May\u0131s 2010<\/td>\n<td rowspan=\"2\" width=\"221\">Development of a multi agent system for negotiation of cost overrun in international construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>70<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Onur \u00c7elenligil<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Temmuz 2010<\/td>\n<td rowspan=\"2\" width=\"221\">Analogical reasoning for risk assessment and cost overrun estimation in construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>71<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Matineh Eybpoosh<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">A\u011fustos 2010<\/td>\n<td rowspan=\"2\" width=\"221\">Identification of risk paths in international construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>72<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Ayd\u0131n Sak\u0131n<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">\u015eubat 2011<\/td>\n<td rowspan=\"2\" width=\"221\">The route map of Turkish international contracting services- lessons learnt and recommendations for the future<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>73<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Nuray G\u00f6kdemir<\/td>\n<td style=\"text-align: center\" width=\"128\">May\u0131s 2011<\/td>\n<td width=\"221\">Identification and representation of information items required for vulnerability assessment and multi-hazard emergency response operations<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>74<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Mohammad Kashef<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">A\u011fustos 2011<\/td>\n<td rowspan=\"2\" width=\"221\">Critical Success Factors for Build Operate Transfer (BOT) projects: Lessons learned from airport projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>75<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Maryam Daneshvar<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Ekim 2011<\/td>\n<td rowspan=\"2\" width=\"221\">Analysis of organisational routines to understand change in construction: The case of Turkish construction industry<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>76<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Noyan Ercan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 2011<\/td>\n<td rowspan=\"2\" width=\"221\">A decision support tool for feasibility assessment of hydro electrical power plant projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>77<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">G\u00f6zde Bilgin<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 2011<\/td>\n<td rowspan=\"2\" width=\"221\">An ontology-based approach for delay analysis<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>78<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Cumhur Ceyhan<\/td>\n<td style=\"text-align: center\" width=\"128\">\u015eubat 2012<\/td>\n<td width=\"221\">Occupational health and safety, hazard identification, risk assessment, determining controls: Case study on cut and cover underground stations and tunnel construction<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>79<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Fatma Pelin Aktu\u011f<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Mart 2012<\/td>\n<td rowspan=\"2\" width=\"221\">Comparison of FIDIC conditions of contract (1999) and UNCITRAL legal guide from prospective disputes and claims perspective<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>80<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">Murat Ayhan<\/td>\n<td style=\"text-align: center\" width=\"128\">Temmuz 2012<\/td>\n<td width=\"221\">A model-based guidance and vulnerability assessment approach for facilities under the threat of multi-hazard emergencies<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>81<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Ayd\u0131n Ghaziani<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">A\u011fustos 2012<\/td>\n<td rowspan=\"2\" width=\"221\">A fuzzy delay assessment tool for construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>82<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">\u015einasi Bekta\u015f<\/td>\n<td style=\"text-align: center\" width=\"128\">A\u011fustos 2012<\/td>\n<td width=\"221\">Shortcomings of delay analysis practices: A case study using an integrated approach<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>83<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Babak Rahmani Mirshekarlou<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 2012<\/td>\n<td rowspan=\"2\" width=\"221\">A taxonomy for causes of changes in construction<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>8<\/strong><strong>4<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Amin Haghgooie<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 2012<\/td>\n<td rowspan=\"2\" width=\"221\">Developing a knowledge taxonomy for business development in construction companies: A case of Turkish construction industry<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>85<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">A\u00e7elya Ecem Y\u0131ld\u0131z<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Aral\u0131k 2012<\/td>\n<td rowspan=\"2\" width=\"221\">Development of a knowledge based risk mapping tool for international construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>86<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Bartu\u011f Kemal Akg\u00fcl<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Haziran 2014<\/td>\n<td rowspan=\"2\" width=\"221\">Social network analysis of construction companies operating in international markets: The case of Turkish contractors<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>87<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">\u015eemsettin Balta<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Haziran 2014<\/td>\n<td rowspan=\"2\" width=\"221\">Buffer sizing model with fuzzy assessment on concrete gravity dam and HEPP projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>88<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Hac\u0131 H\u00fcseyin Erol<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Haziran 2014<\/td>\n<td rowspan=\"2\" width=\"221\">Identifying the effects of lean construction principles on variability of project duration<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>89<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Ehsanullah Hayat<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Haziran 2014<\/td>\n<td rowspan=\"2\" width=\"221\">Factors affecting the risk ratings assigned by decision-makers under uncertain situations: The case of international construction<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>90<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Selman Yal\u00e7\u0131n<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 2014<\/td>\n<td rowspan=\"2\" width=\"221\">Cost comparison of falling from fragile roof type accidents in terms of occupational health and safety<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">G\u00fclru Y\u0131ld\u0131z<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>91<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Ovic M\u2019bi Mabiala<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Ocak 2015<\/td>\n<td rowspan=\"2\" width=\"221\">Turkish contractors in the project finance of power projects in Sub-Saharan Africa (SSA)<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>92<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Osman Can \u00dcrel<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">\u015eubat 2015<\/td>\n<td rowspan=\"2\" width=\"221\">The evaluation of construction projects realized with Public Private Partnership model in Turkey<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>93<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Sahra Mohammadi<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 2015<\/td>\n<td rowspan=\"2\" width=\"221\">The future of green building contracts in Turkey<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"39\"><span style=\"color: #cf014f\"><strong>94<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"149\">\u00d6zg\u00fcr S\u00f6nmez<\/td>\n<td style=\"text-align: center\" width=\"128\">May\u0131s 2016<\/td>\n<td width=\"221\">Glocalization in international construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>95<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Muhammed Ercan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">\u015eubat 2017<\/td>\n<td rowspan=\"2\" width=\"221\">A study on the price escalation system in public construction contracts in Turkey<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>96<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">G\u00f6rkem Eken<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 2017<\/td>\n<td rowspan=\"2\" width=\"221\">Development of a lessons learned management process model and a web-based tool for construction companies<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>97<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Beste \u00d6zyurt<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Ocak 2018<\/td>\n<td rowspan=\"2\" width=\"221\">Similarity assessment of countries to facilitate learning from international construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>98<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Gianni Berk Kubin<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Nisan 2018<\/td>\n<td rowspan=\"2\" width=\"221\">Institutionalization process in a family firm: A case study<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>99<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Muhammed Boztemur<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 2018<\/td>\n<td rowspan=\"2\" width=\"221\">Exploration of Black Swans and their impacts on construction companies: The case of Arab Spring<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c132\u201d\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>100<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">\u00c7a\u011fatay Arslan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Ocak 2019<\/td>\n<td rowspan=\"2\" width=\"221\">Risk identification and assessment for PPP Integrated Health Campus Projects in Turkey. A case study: Kayseri Integrated Health Campus<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Onur B. Tokdemir<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>101<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">P\u0131nar Bilgin<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Temmuz 2019<\/td>\n<td rowspan=\"2\" width=\"221\">Project-based innovation performance assessment in the housing sector: A case study using innovation radar<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>102<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Cansu Co\u015fkun<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 2019<\/td>\n<td rowspan=\"2\" width=\"221\">Development of a risk assessment method for sustainable construction of megaprojects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>103<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Shima Ebrahimi<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 2019<\/td>\n<td rowspan=\"2\" width=\"221\">Awareness of the Turkish construction industry towards industry 4.0 technologies and concepts<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>104<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Cenk Tanr\u0131verdi<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Kas\u0131m 2019<\/td>\n<td rowspan=\"2\" width=\"221\">A casual mapping approach for the analysis of construction disputes<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>105<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Aycan Dumlu<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 2020<\/td>\n<td rowspan=\"2\" width=\"221\">AFMEA-Based methodology for delay analysis of construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><strong>106<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Gizem Bilgin<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Nisan 2021<\/td>\n<td rowspan=\"2\" width=\"221\">An exploratory study on complexity in mega construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>107<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Elif Karako\u00e7ak<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Haziran 2021<\/td>\n<td rowspan=\"2\" width=\"221\">A tool for visualization of risk information: The Risk Box<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>108<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Fatih Kaya<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 2021<\/td>\n<td rowspan=\"2\" width=\"221\">Investigation of legal issues and contractual considerations associated with BIM use in construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Asl\u0131 Ak\u00e7amete G\u00fcng\u00f6r<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>109<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">An\u0131l Y\u0131lmaz<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Kas\u0131m 2021<\/td>\n<td rowspan=\"2\" width=\"221\">Development of an activity-based lessons learned process model and a tool to support scheduling decisions in construction firms<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>110<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">K\u0131van\u00e7 Umut Ejder<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">\u015eubat 2022<\/td>\n<td rowspan=\"2\" width=\"221\">An exploratory study on causes and impacts of variation orders in Public- Private Partnership projects<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>111<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Yusuf Kemal Erdekli<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Haziran 2022<\/td>\n<td rowspan=\"2\" width=\"221\">Prediction of the house price index of Turkey: A comparative study of multiple linear regression and artificial neural network models<\/td>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>112<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Pegah Shokouhi<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">A\u011fustos 2022<\/td>\n<td rowspan=\"2\" width=\"221\">Using post-project reviews for risk assessment of construction projects<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>113<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Bartu Or<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Ocak 2023<\/td>\n<td rowspan=\"2\" width=\"221\">A real options approach to valuation of photovoltaic power investments on rooftops of residential areas in Turkey<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>114<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Muhammed Tunahan Beyhan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">A\u011fustos 2023<\/td>\n<td rowspan=\"2\" width=\"221\">A machine learning approach to seismic risk assessment of reinforced concrete structures<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">R\u0131fat S\u00f6nmez<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>115<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Alper Aslanta\u015f<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">A\u011fustos 2023<\/td>\n<td rowspan=\"2\" width=\"221\">Bayesian belief network-based contractor profitability risk assessment for PPP hospital projects in Turkey<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>116<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Mustafa Erdal<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Eyl\u00fcl 2023<\/td>\n<td rowspan=\"2\" width=\"221\">Identification of critical risk factors affecting waste generation in the Turkish construction industry<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">H\u00fcseyin Erol<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>117<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Berkan Demir<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Nisan 2024<\/td>\n<td rowspan=\"2\" width=\"221\">Enhancing circular economy adoption in the industrial steel construction industry: A blockchain-based information flow framework<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"39\"><span style=\"color: #cf014f\"><br \/>\n<strong>118<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\">Tolgahan \u00d6zkan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\">Nisan 2024<\/td>\n<td rowspan=\"2\" width=\"221\">Comparison of Time Slice Windows Analysis with the delay analysis methods frequently used in the construction industry: A case study<\/td>\n<td style=\"text-align: center\" width=\"132\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\">\u0130rem Dikmen<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h4 style=\"text-align: center\">________________<\/h4>\n<h4 style=\"text-align: center\"><\/h4>\n<h4 style=\"text-align: center\">Y\u00d6NET\u0130LEN DOKTORA TEZLER\u0130<\/h4>\n<table style=\"border-color: #000000\" border=\"1\">\n<tbody>\n<tr>\n<td rowspan=\"2\" width=\"39\"><strong>\u00a0<\/strong><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"149\"><span style=\"color: #cf0101\"><strong>\u00d6\u011frenci Ad\u0131<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"128\"><span style=\"color: #cf0101\"><strong>Tez Bitirme Tarihi<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"221\"><span style=\"color: #cf0101\"><strong>Tez Ba\u015fl\u0131\u011f\u0131<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"132\"><span style=\"color: #cf0101\"><strong>Tez Y\u00f6neticisi<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"132\"><span style=\"color: #cf0101\"><strong>Yard\u0131mc\u0131 Tez Y\u00f6neticisi<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>1<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">Aynur Kazaz<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Kas\u0131m 1997<\/td>\n<td rowspan=\"2\" width=\"243\">Toplu konut in\u015faatlar\u0131nda d\u00fc\u015f\u00fck kaliteden kaynaklanan maliyetler (F\u0131rat \u00dcniversitesi)<\/td>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c142\u201d\">As\u0131m Ye\u011finobal\u0131<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>2<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">Can Elmar Balas<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Ocak 1998<\/td>\n<td rowspan=\"2\" width=\"243\">A reliability-based risk assessment model for coastal projects<\/td>\n<td style=\"text-align: center\" width=\"142\">Ay\u015fen Ergin<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c142\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"36\"><span style=\"color: #cf014f\"><strong>3<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"140\">\u0130rem Dikmen<\/td>\n<td style=\"text-align: center\" width=\"106\">Nisan 2001<\/td>\n<td width=\"243\">Strategic decision making in construction companies: An artificial neural network based decision support system for international market selection<\/td>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>4<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">G\u00f6khan Arslan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Ekim 2002<\/td>\n<td rowspan=\"2\" width=\"243\">\u0130hale y\u00f6netimi bilgi sistemleri: \u0130n\u015faat projelerinde elektronik ihale teklif y\u00f6ntemi sistemi (Anadolu \u00dcniversitesi)<\/td>\n<td style=\"text-align: center\" width=\"142\">Mustafa Tuncan<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c142\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>5<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">Beliz \u00d6zorhon<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Ekim 2007<\/td>\n<td rowspan=\"2\" width=\"243\">Modeling the performance of international construction joint ventures<\/td>\n<td style=\"text-align: center\" width=\"142\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"\u201c142\u201d\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>6<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">Cenk Budayan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Temmuz 2008<\/td>\n<td rowspan=\"2\" width=\"243\">Strategic group analysis: Strategic perspective, differentiation and performance in construction<\/td>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"142\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>7<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">Zeynep I\u015f\u0131k<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Kas\u0131m 2009<\/td>\n<td rowspan=\"2\" width=\"243\">A conceptual performance measurement framework for construction industry<\/td>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"142\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>8<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">Emre Caner Ak\u00e7ay<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Aral\u0131k 2014<\/td>\n<td rowspan=\"2\" width=\"243\">Using Monte Carlo Simulation and Multi-Agent systems to estimate financial feasibility of HEPP projects tendered on a\u00a0 BOT basis: A Case study from Turkey<\/td>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"142\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"36\"><span style=\"color: #cf014f\"><strong>9<\/strong><\/span><\/td>\n<td style=\"text-align: center\" width=\"140\">Mustafa \u00d6zdemir<\/td>\n<td style=\"text-align: center\" width=\"106\">May\u0131s 2015<\/td>\n<td width=\"243\">A fuzzy Structural Equation Model to analyze relationships between determinants of safety performance in construction sites: Development of a safety performance index assessment tool<\/td>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>10<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">Babak Rahmani Mirshekarlou<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Aral\u0131k 2018<\/td>\n<td rowspan=\"2\" width=\"243\">An investigation of material waste management in prefabricated construction industry and developing an integrated waste management tool<\/td>\n<td style=\"text-align: center\" width=\"142\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>11<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">G\u00fcls\u00fcm \u00c7a\u011f\u0131l K\u00f6seo\u011flu Balta<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">May\u0131s 2019<\/td>\n<td rowspan=\"2\" width=\"243\">A Bayesian Belief Network based delay risk assessment tool for tunnel projects- BBN Tunnel<\/td>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"142\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>12<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">Murat Ayhan<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Aral\u0131k 2019<\/td>\n<td rowspan=\"2\" width=\"243\">Development of dispute prediction and resolution method selection models for construction disputes<\/td>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"142\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>13<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">H.H\u00fcseyin Erol<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Kas\u0131m 2020<\/td>\n<td rowspan=\"2\" width=\"243\">Incorporating complexity into risk management: An integrated risk assessment process for mega construction projects<\/td>\n<td style=\"text-align: center\" width=\"142\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>14<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">G\u00f6rkem Eken<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Aral\u0131k 2022<\/td>\n<td rowspan=\"2\" width=\"243\">Using Natural Language Processing for automated construction contract review during risk assessment at the bidding stage<\/td>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"142\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>15<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">Beste \u00d6zyurt Ers\u00f6z<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">Eyl\u00fcl 2024<\/td>\n<td rowspan=\"2\" width=\"243\">Using digital technologies to facilitate identification of political risks in international construction projects<\/td>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"142\">\u0130rem Dikmen<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"36\"><span style=\"color: #cf014f\"><strong>16<\/strong><\/span><\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"140\">Saeed Kamali<\/td>\n<td style=\"text-align: center\" rowspan=\"2\" width=\"106\">\u015eubat 2025<\/td>\n<td rowspan=\"2\" width=\"243\">Conceptual framework to evaluate and enhance resilience of Public-Private Partnership Projects<\/td>\n<td style=\"text-align: center\" width=\"142\">Talat Birg\u00f6n\u00fcl<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"142\">\u0130rem Dikmen<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Y\u00d6NET\u0130LEN Y\u00dcKSEK L\u0130SANS TEZLER\u0130 \u00a0 \u00a0 \u00d6\u011frenci Ad\u0131 Tez Bitirme Tarihi \u00a0 Tez Ba\u015fl\u0131\u011f\u0131 \u00a0 Tez Y\u00f6neticisi Yard\u0131mc\u0131 Tez Y\u00f6neticisi 1 Jamal Lababidi Kas\u0131m 1988 Concrete construction under different climatic conditions and factors affecting the cost estimate Talat Birg\u00f6n\u00fcl 2 Ramazan \u00c7uhadar \u015eubat 1989 A survey on the construction equipment supply and importation of Turkish [&hellip;]<\/p>\n","protected":false},"author":4304,"featured_media":0,"parent":0,"menu_order":6,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-49","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/blog.metu.edu.tr\/birgonul\/tr\/wp-json\/wp\/v2\/pages\/49","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.metu.edu.tr\/birgonul\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/blog.metu.edu.tr\/birgonul\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/blog.metu.edu.tr\/birgonul\/tr\/wp-json\/wp\/v2\/users\/4304"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.metu.edu.tr\/birgonul\/tr\/wp-json\/wp\/v2\/comments?post=49"}],"version-history":[{"count":0,"href":"https:\/\/blog.metu.edu.tr\/birgonul\/tr\/wp-json\/wp\/v2\/pages\/49\/revisions"}],"wp:attachment":[{"href":"https:\/\/blog.metu.edu.tr\/birgonul\/tr\/wp-json\/wp\/v2\/media?parent=49"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}