Publications

PUBLICATIONS

(INTERNATIONAL)

CHAPTER IN A BOOK

  1. Birgonul, M.T. (1992). “The Performance of Simplified and Conventional Travel Demand Models in the Context of Medium-Sized Cities of Developing Countries”, in a book entitled “Simplified Transport Demand Modelling” edited by Juan de Dios Ortuzar, PTRC Education and Research Services, UK, pp. 57‑61.
  2. Birgonul, M.T. and Bayırtepe, H. (1993). “Provision of Travelway Space for Urban Public Transport in Developing Countries”, United Nations Centre for Human Settlements (HABITAT), Nairobi, Kenya, pp. 75-109.
  3. Bon, R., Birgonul, M.T. and Ozdogan, İ. (2000). “An Input-Output Analysis of the Turkish Construction Sector, 1973-1990”, Chapter 21, in a book entitled “Economic Structure and Maturity” authored by Ranko Bon, Ashgate Publishing Ltd., UK, pp. 377-387.
  4. Bon, R., Birgonul, M.T. and Ozdogan, İ. (2000). “Comparative Stability of Demand-Side and Supply-Side Input-Output Models: The Case of Turkey, 1973-1990”, Chapter 10, in a book entitled “Economic Structure and Maturity” authored by Ranko Bon, Ashgate Publishing Ltd., UK, pp.163-171.
  5. Dikmen, I., Birgonul, M.T. and Ataoglu, T. (2005). “Emprical Investigation of Organisational Learning Ability as a Performance Driver in Construction”, Chapter 10, in a book entitled “Knowledge Management in the Construction Industry: A Socio-Technical Perspective”, edited by Abdul Samad Kazi, Idea Group Publishing Inc., USA.
  6. Dikmen, I., Birgonul, M.T. and Atasoy, G. (2009). “Best Value Procurement in Build Operate Transfer Projects: The Turkish Experience”, Chapter 19, in a book entitled “Policy, Finance and Management for Public-Private Partnerships”, edited by Akintola Akintoye and Matthias Beck, Wiley-Blackwell Publishing, UK.
  7. Birgonul, M.T., Dikmen, I. and Ozorhon, B. (2009). “The Impact of Reverse Knowledge Transfer on Domestic Market: The Case of Turkey”, Chapter 11,  in a book entitled “Economics for the Modern Built Environment”, edited by Les Ruddock, Taylor & Francis Publishing, UK.
  8. Dikmen, I., Birgonul, M.T. and Anac, C. (2011). “Strategic Issues in Entering Emerging Markets”, Chapter 8, in a book entitled “Organization Management in Construction”, edited by Paul S. Chinowsky and Anthony D. Songer, Spon Press, UK.
  9. Birgonul, M.T., Dikmen, I. and Ozenen, C.G. (2015). “Public Private Partnership in Turkey”, Chapter 20, in a book entitled “Public Private Partnerships; A Global Review”, edited by Akintola Akintoye, Matthias Beck and Mohan Kumaraswamy, Routledge, UK.

REFEREED PAPERS IN JOURNALS

  1. Birgonul, M.T. and Ural, D. (1995). “Value Management Approach for the Design Choice and Material Selection Process of Mass Housing Projects”, International Journal for Housing Science and its Applications, Vol.19, No.4, 289-299.
  2. Birgonul, M.T. and Dikmen, İ. (1996). “Probabilistic Life Cycle Cost Analysis Incorporating Multi Attribute Utility Assessment”, International Journal for Housing Science and its Applications, Vol.20, No.3, 189-202.
  3. Bon, R., Birgonul, M.T. and Ozdogan, İ. (1999). “A Note: An Input-Output Analysis of the Turkish Construction Sector, 1973-1990”, Journal of Construction Management and Economics, Vol.17, No.5, 543-551.
  4. Ozdogan, İ., Dikmen, İ., and Birgonul, M.T. (2000). “A Decision Support Framework for Project Sponsors in the Planning Stage of Build-Operate-Transfer (BOT) Projects”, Journal of Construction Management and Economics, Vol.18, No.3, 343-353.
  5. Dikmen, İ. and Birgonul, M.T. (2003). “Strategic Perspective of Turkish Construction Companies”, ASCE Journal of Management in Engineering, Vol.19, No.1, 33-40.
  6. Dikmen, İ. and Birgonul, M.T. (2004). “Neural Network Model to Support International Market Entry Decisions”, ASCE Journal of Construction Engineering and Management, Vol.130, No.1, 59-66.
  7. Kazaz, A. and Birgonul, M.T. (2005). “Determination of Quality Level in Mass Housing Projects in Turkey”, ASCE Journal of Construction Engineering and Management, 131(2), 195-202.
  8. Dikmen, İ., Birgonul, M.T. and Kızıltas, S. (2005). “Prediction of Organizational Effectiveness in Construction Companies”, ASCE Journal of Construction Engineering and Management, 131(2), 252-261.
  9. Dikmen, İ., Birgonul, M.T. and Artuk, S. (2005). “Integrated Framework to Investigate Value Innovations”, ASCE Journal of Management in Engineering, Vol.21, No.2, 81-90.
  10. Dikmen, İ., Birgonul, M.T. and Kızıltas, S. (2005). “Strategic Use of Quality Function Deployment (QFD) in the Construction Industry”, Building and Environment, 40, 245-255.
  11. Dikmen, İ., Birgonul, M.T. and Ozcenk, İ. (2005). “Marketing Orientation in Construction Firms: Evidence from Turkish Contractors”, Building and Environment, 40, 257-265.
  12. Ozorhon, B., Dikmen, İ. and Birgonul, M.T. (2005). “Organizational Memory Formation and Its Use in Construction”, Building Research and Information, 33(1), 67-79.
  13. Kazaz, A., Birgonul, M.T. and Ulubeyli, S. (2005). “Cost-Based Analysis of Quality in Developing Countries: A Case Study of Building Projects”, Building and Environment, 40, 1356–1365.
  14. Kazaz, A. and Birgonul, M.T. (2005). “The Evidence of Poor Quality in High Rise and Medium Rise Housing Units: A Case Study of Mass Housing Projects in Turkey”, Building and Environment, 40, 1548–1556.
  15. Arslan, G., Tuncan, M., Birgonul, M.T. and Dikmen, İ. (2006). “E-Bidding Proposal Preparation System for Construction Projects”, Building and Environment, 41(10), 1406-1413.
  16. Dikmen, İ., and Birgonul, M.T. (2006). “An Analytical Hierarchy Process Based Model for Risk and Opportunity Assessment of International Construction Projects”, Canadian Journal of Civil Engineering, 33(1), 58-68.
  17. Ozorhon, B., Dikmen, İ., and Birgonul, M.T. (2006). “Case-Based Reasoning Model for International Market Selection”, ASCE Journal of Construction Engineering and Management, 132(9), 940-948.
  18. Dikmen, İ., and Birgonul, M.T. (2006). “A Review of International Construction Research: Ranko Bon’s Contribution”, Construction Management and Economics, Vol.24, No.7, 725-733.
  19. Sonmez, R., Ergin, A. and Birgonul, M.T. (2007). “Quantitative Methodology for Determination of Cost Contingency in International Projects”, ASCE Journal of Management in Engineering, Vol. 23, No.1, 35-39.
  20. Dikmen, İ., Birgonul, M.T. and Han, S. (2007). “Using Fuzzy Risk Assessment to Rate Cost Overrun Risk in International Construction Projects”, International Journal of Project Management, 25(5), 494-505.
  21. Ozorhon, B., Dikmen, İ., and Birgonul, M.T. (2007). “Using Analytical Network Process to Predict the Performance of International Construction Joint Ventures”, ASCE Journal of Management in Engineering, 23(3), 156-163.
  22. Dikmen, İ., Birgonul, M.T., and Ozorhon, B. (2007). “Project Appraisal and Selection Using the Analytical Network Process”, Canadian Journal of Civil Engineering, 34(7), 786-792.
  23. Dikmen, İ., Birgonul, M.T., and Gur, A.K. (2007). “A Case-Based Decision Support Tool for Bid Mark-up Estimation of International Construction Projects”, Automation in Construction, 17(1), 30-44.
  24. Ozorhon, B., Arditi, D., Dikmen, İ., and Birgonul, M.T. (2007). “Effect of Host Country and Project Conditions in International Construction Joint Ventures”, International Journal of Project Management, 25(8), 799-806.
  25. Ozorhon, B., Arditi, D., Dikmen, İ., and Birgonul, M.T. (2008). “Effect of Partner Fit in International Construction Joint Ventures”, ASCE Journal of Management in Engineering, 24(1), 12-20.
  26. Kivrak, S., Arslan, G., Dikmen, İ., and Birgonul, M.T. (2008). “Capturing Knowledge in Construction Projects: Knowledge Platform for Contractors”, ASCE Journal of Management in Engineering, 24(2), 87-95.
  27. Ozorhon, B., Arditi, D., Dikmen, İ., and Birgonul, M.T. (2008). “The Role of Organisational Culture in Construction Company Alliances”, International Journal of Human Resources Development and Management, 8(3), 177-191.
  28. Arslan, G., Kivrak, S., Birgonul, M.T. and Dikmen, İ. (2008). “Improving Sub-Contractor Selection Process in Construction Projects: Web-based Sub-Contractor Evaluation System (WEBSES)”, Automation in Construction, 17(4), 480-488.
  29. Ozorhon, B., Arditi, D., Dikmen, İ., and Birgonul, M.T. (2008). “Implications of Culture in the Performance of International Construction Joint Ventures”, ASCE Journal of Construction Engineering and Management, 134(5), 361-370.
  30. Dikmen, İ., Birgonul M.T., Anac, C., Tah, J.H.M. and Aouad, G. (2008). “Learning from Risks: A Tool for Post-Project Risk Assessment”, Automation in Construction, 18(1), 42-50.
  31. Dikmen, İ., Birgonul, M. T. and Budayan, C. (2009). “Strategic Group Analysis in the Construction Industry”, ASCE Journal of Construction Engineering and Management, 135(4), 288-297.
  32. Isik, Z., Arditi, D., Dikmen, and Birgonul, M.T. (2009). “Impact of Corporate Strengths/weaknesses on Project Management Competencies”, International Journal of Project Management, 27(6), 629-637.
  33. Bu-Qammaz, A.S., Dikmen, I. and Birgonul, M.T. (2009). “Risk Assessment of International Construction Projects Using the Analytic Network Process”, Canadian Journal of Civil Engineering, 36(7), 1170-1181.
  34. Budayan, C., Dikmen, İ. and Birgonul, M.T. (2009). “Comparing the Performance of Traditional Cluster Analysis, Self-Organizing Maps and Fuzzy C-Means Method for Strategic Grouping”, Expert Systems with Applications, 36(9), 11772-11781.
  35. Dikmen, İ., Birgonul, M.T. and Fidan, G. (2009). “A Risk and Vulnerability Ontology for Construction Projects”, International Journal of Engineering and Management, Vol.1, No.1, 63-70.
  36. Isik, Z., Arditi, D., Dikmen, İ., and Birgonul, M.T. (2010). “Impact of Resources and Strategies on Construction Company Performance”, ASCE Journal of Management in Engineering, 26(1), 9-18.
  37. Isik, Z., Arditi, D., Dikmen, İ., and Birgonul, M.T. (2010). “The Role of Exogenous Factors in the Strategic Performance of Construction Companies”, Engineering, Construction and Architectural Management, Vol.17, No.2, 119-134.
  38. Dikmen, İ., Birgonul, M.T., Ozorhon, B. and Egilmezer Sapci, N. (2010). “Using Analytic Network Process to Assess Business Failure Risks of Construction Firms”, Engineering, Construction and Architectural Management, Vol.17, No.4, 369-386.
  39. Ozorhon, B., Arditi, D., Dikmen, İ., and Birgonul, M.T. (2010). “Performance of International Joint Ventures in Construction”, ASCE Journal of Management in Engineering, 26(4), 209-222.
  40. Fidan, G., Dikmen, İ., Tanyer, A.M. and Birgonul, M.T. (2011). “Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects”, ASCE Journal of Computing in Civil Engineering, 25(4), 302-315.
  41. Soibelman, L., Sacks, R., Akinci, B., Dikmen, İ., Birgonul, M.T. and Eybpoosh, M. (2011). “Preparing Civil Engineers for International Collaboration in Construction Management”, ASCE Journal of Professional Issues in Engineering Education and Practice, 137(3), 141-150.
  42. Ozcan, G., Dikmen, İ., and Birgonul, M.T. (2011). “Assessment of Risk Paths in Construction Projects”, International Journal of Project Organisation and Management, Vol. 3, Nos 3/4, 316-334.
  43. Ozorhon, B., Arditi, D., Dikmen, İ., and Birgonul, M.T. (2011). “Toward a Multidimensional Performance Measure for International Joint Ventures in Construction”, ASCE Journal of Construction Engineering and Management, 137(6), 403-411.
  44. Eybpoosh, M., Dikmen, İ., and Birgonul, M.T. (2011). “Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling”, ASCE Journal of Construction Engineering and Management, 137(12), 1164-1175.
  45. Budayan, C., Dikmen, İ., and Birgonul, M.T. (2011). “Hybrid Strategic Groups in Construction”, Engineering Project Organization Journal, Vol. 1, Issue 3, 183-196.
  46. Dikmen, İ., Birgonul, M.T., Tah, J.H.M. and Ozer, A.H. (2012). “A Web-Based Risk Assessment Tool Using Integrated Duration – Cost Influence Network Model”, ASCE Journal of Construction Engineering and Management, 138(9), 1023-1034.
  47. Karakas, K., Dikmen, İ., and Birgonul, M.T. (2013). “Multiagent System to Simulate Risk-Allocation and Cost-Sharing Processes in Construction Projects”, ASCE Journal of Computing in Civil Engineering, 27(3), 307-319.
  48. Budayan, C., Dikmen, İ., and Birgonul, M.T. (2013). “Investigation of Drivers and Modes of Differentiation in Turkish Construction Industry”, Engineering, Construction and Architectural Management, Vol 20, No 4, 345-364.
  49. Yildiz, A.E., Dikmen, I., Birgonul, M.T., Ercoskun, K. and Alten, S. (2014). “A Knowledge-Based Risk Mapping Tool for Cost Estimation of International Construction Projects”, Automation in Construction, 43, 144-155.
  50. Kivrak, S., Arslan, G., Tuncan, M. and Birgonul, M.T. (2014). “Impact of National Culture on Knowledge Sharing in International Construction Projects”, Canadian Journal of Civil Engineering, 41(7), 642-649.
  51. Birgonul, M.T., Dikmen, I. and Bektaş, Ş. (2015). “An Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices”, ASCE Journal of Construction Engineering and Management, 141(4), 04014088.
  52. Guven, G., Ergen, E., Kurc, O., Erberik, M.A., Ergin, T., Birgonul, M.T. and Akınci, B. (2015). “Blockage Assessment of Buildings during Emergency Using Multiple Types of Sensors”, Automation in Construction, 49, 71-82.
  53. Budayan, C., Dikmen, I. and Birgonul, M.T. (2015). “Alignment of Project Management with Business Strategy in Construction: Evidence from the Turkish Contractors”, Journal of Civil Engineering and Management, Vol 21(1), 94-106.
  54. Birgonul, M. T., Dikmen, I., Budayan, C. and Demirel, T. (2016). “An Expert System for the Quantification of Fault Rates in Construction Fall Accidents”,International Journal of Occupational Safety and Ergonomics, Vol 22, No. 1, 20–31.
  55. Mohammadi S. and Birgonul M. T. (2016). Preventing Claims in Green Construction Projects through Investigating the Components of Contractual and Legal Risks, Journal of Cleaner Production, 139, 1078 – 1084.
  56. Erol, H., Dikmen, I. and Birgonul, M.T. (2017). “Measuring the Impact of Lean Construction Practices on Project Duration and Variability:  A Simulation-based Study on Residential Buildings”, Journal of Civil Engineering and Management, Volume 23(2): 241–251.
  57. Akgul, B.K., Ozorhon, , Dikmen, I. and Birgonul, M.T. (2017). “Social Network Analysis of Construction Companies Operating in International Markets: Case of Turkish Contractors”, Journal of Civil Engineering and Management, Volume 23(3): 327–337.
  58. Gunduz, M., Birgonul, M.T. and Ozdemir, M. (2017). “Fuzzy Structural Equation Model to Assess Construction Site Safety Performance”, ASCE Journal of Construction Engineering and Management, 143(4), 04016112 – 1-16.
  59. Bettemir, O.H. and Birgonul, M.T. (2017). “Network Analysis Algorithm for the Solution of Discrete Time-Cost Trade-off Problem”, KSCE Journal of Civil Engineering, 21 (4), 1047-1058.
  60. Akcay, E.C., Dikmen, I., Birgonul, M.T. and Arditi, D. (2017). “Estimating the Profitability of Hydropower Investments with a Case Study from Turkey”, Journal of Civil Engineering and Management, Volume 23(8): 1002–1012.
  61. Bilgin, G., Dikmen, I. and Birgonul, M.T. (2018). “An Ontology-based Approach for Delay Analysis in Construction”, KSCE Journal of Civil Engineering, 22 (2), 384-398.
  62. Balta, S., Birgonul, M.T. and Dikmen, I. (2018). “Buffer Sizing Model Incorporating Fuzzy Risk Assessment: A Case Study on Concrete Gravity Dam and Hydroelectric Power Plant Projects”, ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 4(1): 04017039 – 1-10.
  63. Birgonul, M.T., Dikmen, I. and Bektaş, Ş. (2018). “Comparison of an Emerging Seat of Arbitration and Leading Arbitration Seats and Recommendations for Reform”, ASCE Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10(1), 04517023 – 1-10.
  64. Budayan, C., Dikmen, I., Birgonul, M.T. and A. (2018). “A Computerized Method for Delay Risk Assessment Based on Fuzzy Set Theory using MS ProjectTM”, KSCE Journal of Civil Engineering, Volume 22(8): 2714–2725.
  65. Gunduz, M., Birgonul, M.T. and Ozdemir, M. (2018). “Development of a Safety Performance Index Assessment Tool by Using a Fuzzy Structural Equation Model for Construction Sites”, Automation in Construction, Volume 85, 124–134.
  66. Dikmen, I., Budayan, C., Birgonul, M.T. and Hayat. E. (2018). “Effects of Risk Attitude and Controllability Assumption on Risk Ratings: An Observational Study on International Construction Project Risk Assessment”, ASCE Journal of Management in Engineering, 34(6), 4018037 – 1-12.
  67. Akcay, E.C., Dikmen, I., Birgonul, M.T. and Arditi, D. (2019). “Negotiating the Selling Price of Hydropower Energy Using Multi-Agent Systems in BOT”, Journal of Civil Engineering and Management, Volume 25(5): 441–450.
  68. Qazi, A., Dikmen, I. and Birgonul, M.T. (2020). “Mapping Uncertainty for Risk and Opportunity Assessment in Projects”, Engineering Management Journal, 32, No. 2, 86-97, https://doi.org/10.1080/10429247.2019.1664249.
  69. Budayan, C., Dikmen, I. and Birgonul, M.T. (2019). “Construction Cost Map of European Countries”, The Engineering Economist, Vol. 65, No. 2, 135–157, doi: 10.1080/0013791X.2019.1668097.
  70. Eken, G., Bilgin, G., Dikmen, I. and Birgonul, M.T. (2020). “A lessons-learned Tool for Organizational Learning in Construction”, Automation in Construction, https://doi.org/10.1016/j.autcon.2019.102977, Volume 110.
  71. Yildiz, A.E., Dikmen, I. and Birgonul, M.T. (2020). “Using System Dynamics for Strategic Performance Management in Construction”, ASCE Journal of Management in Engineering, https://doi.org/10.1061/(ASCE)ME.1943-5479.0000744, Volume 36, Issue 2, pp 04019051-1-15.
  72. Ozyurt, B., Dikmen, I. and Birgonul, M.T. (2020). “Clustering of Host Countries to Facilitate Learning Between Similar International Construction Markets”, Engineering, Construction and Architectural Management, doi: 10.1108/ECAM-11-2018-0495. 27, No. 1, pp. 66-82.
  73. Qazi, A., Dikmen, I. and Birgonul, M.T. (2020). “Prioritization of Interdependent Uncertainties in Projects”, International Journal of Managing Projects in Business, org/10.1108/IJMPB-10-2019-0253.Vol. 13, No. 5, pp. 913-935.
  74. Erol, H., Dikmen, I., Atasoy, G. and Birgonul, M.T. (2020). “Exploring the Relationship between Complexity and Risk in Megaconstruction Projects”, ASCE Journal of Construction Engineering and Management, https://doi.org/10.1061/(ASCE)CO.1943-7862.0001946. 146, Issue 12, pp. 04020138-1-14.
  75. Bektas, S., Birgonul, M.T. and Dikmen, I. (2021). “Integrated Probabilistic Delay Analysis Method to Estimate Expected Outcome of Construction Delay Disputes”, ASCE Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, DOI: 10.1061/(ASCE)LA.1943-4170.0000439. Volume 13, Issue 1, 04520037-1-18.
  76. Dikmen, I., Qazi, A., Erol, H. and Birgonul, M.T. (2021). “Meta-modeling of Complexity Uncertainty-Performance Triad in Construction Projects”, Engineering Management Journal, https://doi.org/10.1080/10429247.2020.1772698. Volume 33, Issue 1, pp 30-44.
  77. M, Dikmen, I. and Birgonul, M.T. (2021). “Predicting the Occurrence of Construction Disputes using Machine Learning Techniques”, ASCE Journal of Construction Engineering and Management, DOI: 10.1061/(ASCE)CO.1943-7862.0002027. Vol.147, Issue 4, pp. 04021022-1-15.
  78. Tanrıverdi, C., Atasoy, G., Dikmen, I. and Birgonul, M.T. (2021). “Causal Mapping to Explore Emergence of Construction Disputes”, Journal of Civil Engineering and Management, https://doi.org/10.3846/jcem.2021.14900, Volume 27, Issue 5, pp. 288–302.
  79. Koseoglu Balta, G.C., Dikmen, I. and Birgonul, M.T. (2021). “Bayesian Network Based Decision Support for Predicting and Mitigating Delay Risk in TBM Tunnel Projects”, Automation in Construction, https://doi.org/10.1016/j.autcon.2021.103819, Volume 129.
  80. Mirshekarlou, B.R., Budayan, C., Dikmen, I. and Birgonul, M.T. (2021). “Development of a Knowledge-based Tool for Waste Management of Prefabricated Steel Structure Projects”, Journal of Cleaner Production, https://doi.org/10.1016/j.jclepro.2021.129140, Volume 323:129140.
  81. Ayhan, M., Dikmen, I. and Birgonul, M.T. (2022). “Comparing Performances of Machine Learning Techniques to Forecast Dispute Resolutions”, Teknik Dergi, https://doi.org/10.18400/tekderg.930076, Volume 33, Issue 5, pp 12577-12600.
  82. Erol H., Dikmen, I., Atasoy, G. and Birgonul, M.T. (2022). “An Analytic Network Process Model for Risk Quantification of Mega Construction Projects”, Expert Systems with Applications, https://doi.org/10.1016/j.eswa.2021.116215, 191 (2022) 116215.
  83. Atasoy, G., Ertaymaz, U., Dikmen, I. and Birgonul, M.T. (2022). “Empowering Risk Communication: Use of Visualizations to Describe Project Risks”, ASCE Journal of Construction Engineering and Management, https://doi.org/10.1061/(ASCE)CO.1943-7862.0002265, Vol.148, Issue 5, 04022015-1-14.
  84. Erol, H., Dikmen, I., Atasoy, G., Kaya, Hazal Deniz and Birgonul, M.T. (2022). “A Decision-Support Tool for Risk and Complexity Assessment and Visualization in Construction Projects”, Computers in Industry, https://doi.org/10.1016/j.compind.2022.103694, Vol 141, October 2022,103694.
  85. Bilgin, G., Dikmen, I., Birgonul, M.T. and Ozorhon, B. (2023). “A Decision Support System for Project Portfolio Management in Construction Companies”, International Journal of Information Technology & Decision Making, https://doi.org/10.1142/S0219622022500821, Vol. 22, No. 2, pp. 705–735.
  86. Bilgin, G., Erol, H., Atasoy, G., Dikmen, I. and Birgonul, M.T. (2022). “Exploring Pattern of Complexity in Mega Construction Projects”, International Journal of Managing Projects in Business, https://doi.org/10.1108/IJMPB-03-2022-0064, 15, No. 7, pp. 1064-1090.
  87. Ayhan. M, Dikmen, I. and Birgonul, M.T. (2023). “Classifying Compensations in Construction Disputes using Machine Learning Techniques”, Journal of Engineering Research, https://doi.org/10.36909/jer.12683, Vol. 11 No.(1B) pp.101-111.
  88. Coskun. C., Dikmen, I. and Birgonul, M.T. (2023). “Sustainability Risk Assessment in Mega Construction Projects, Built Environment Project and Asset Management, https://doi.org/10.1108/BEPAM-10-2022-0153. Vol. 13, No. 5, pp.700-718.
  89. Bettemir, O.H. and Birgonul, M.T. (2024). “Solution of Discrete Time-Cost Trade-off Problem with Adaptive Search Domain”, Engineering, Construction and Architectural Management, (Paper accepted and waitlisted for publication).
  90. Or, B., Bilgin, G., Akcay, E.C., Dikmen, I. and Birgonul, M.T. (2024). “Real Options Valuation of Photovoltaic Investments: A case from Turkey”, Renewable and Sustainable Energy Reviews, (Paper accepted and waitlisted for publication).

REFEREED PAPERS IN CONFERENCE PROCEEDINGS

  1. Birgonul, M.T. (1989). “The Performance of Simplified and Conventional Travel Demand Models in the Context of Medium-Sized Cities of Developing Countries”, PTRC 17th Summer Annual Meeting, 11-15 September, University of Sussex, England, pp.3-9.
  2. Birgonul, M.T. (1989). “Probabilistic Quantity Estimation of Basic Construction Items by Linear Regression Method for Low-Cost Housing Projects in Turkey”, IAHS World Congress on Housing, 23-27 October, University of Porto, Portugal, Vol.2, pp. 143- 151.
  3. Bayırtepe, H. and Birgonul, M.T. (1990). “A Critique on the Applicability and Suitability of World Bank Procedure for Financing Highway Projects of Developing Countries with Specific Reference to Turkey”, PTRC 18th Summer Annual Meeting, 10-14 September, University of Sussex, England, pp. 61-73.
  4. a) Birgonul, M.T. ve Erdogan, C. (1992). “Strategies for Improving Quality and Maximizing Economy in Housing Projects of Turkey”, CIB’92 World Building Congress, 18-22 May, Montreal, Canada, Poster Book,  Tome 2,  418-419.                                                                                                                                                                                              b) Birgonul, M.T. ve Erdogan, C. (1992). “Strategies for Improving Quality and Maximizing Economy in Housing Projects of Turkey”, CIB’92 World Building Congress, 18-22 May, Montreal, Canada, Proceedings, Tome 2, 515-518.
  5. Birgonul, M.T., and Uygurer, F. (1992). “Economic Evaluation of Time-Shared Ownership Versus Purchasing a Summer House”, IAHS XXth World Congress on Housing, 21-25 September, Birmingham, England, pp.837-848.
  6. Ergin, A., Balas C.E., Birgonul, M.T. and Yalciner, A.C. (1993). “A Network Planning Model for the Multiple Unit Construction Projects of Hydraulic Systems”, XXVth IAHR Congress, Proceedings of the International Association for Hydraulic Research Congress, Tokyo, Japan, 30 August-3 September, Volume 5, pp.180-187.
  7. Birgonul, M.T., Kuskapan Uygurer, F. and Cetin, İ. (1993). “Decision Making Strategies in Between the ‘Lease-Rent-Buy’ Options of Construction Machinery and Equipment Ownership Types”, Advances in Civil Engineering 1st Technical Congress, Gazi Mağusa, North Cyprus, 25-27 October, Volume 2, pp. 1057‑1066.
  8. Sahin, M.T., Yeginobali, A. and Birgonul, M.T. (1993). “Initial Investment and Life Cycle Cost Analysis of Insulation and Heating Systems in Buildings”, Advances in Civil Engineering 1st Technical Congress, Gazi Mağusa, North Cyprus, 25-27 October, Volume 2, pp. 1067-1077.
  9. Mohamed, A.N., Birgonul, M.T. and Celik, T. (1994). “Effect of Inflation and Payment Delay on Contractor’s Profit Margin under Unit Price Contracting System and Compensation Methods”, Transactions of 13th International Cost Engineering Congress, October 1994, London, UK, pp.PA6.1-PA6.21.
  10. Birgonul, M.T. (1994). “Turkish Experience in the Financing of Mass Housing Projects”, IAHS XXIInd World Housing Congress, Salzburg, Austria, October, pp. 52-61.
  11. Haksever, M., Pickering, G. and Birgonul, T. (1995). “The Relationship of UK PhD Researchers in Construction Management with Industry: A Double Edged Sword” CIB W89 Symposium, Orlando, Florida, S.A., 5-7 April, pp. 689-696.
  12. Ergin, A., Balas, C.E. and Birgonul, M.T. (1995). “The Optimum Port Construction Planning Model”, Proceedings of the Fourth International Conference on Coastal and Port Engineering in Developing Countries (COPEDEC IV), Rio de Janerio, Brazil, 25-29 September, Vol.1, pp. 658-672.
  13. Birgonul, M.T. and Dikmen, İ. (1996). “A Methodology for the Evaluation of Proposals Tendered on the Basis of Build-Operate-Transfer (BOT) Model”, Proceedings of ARCOM 1996 (Association of Researchers in Construction Management) 12th Annual Conference, Sheffield, England, 11-13 September, Vol.1, pp.140-149.
  14. Birgonul, M.T., Ozdogan (Dikmen), İ. and Arikan, M. (1997). “Economic Analysis of Multi-Storey Core Housing Model”, XXVth IAHS World Housing Congress, Sinaia, Romania, September 1-4, pp.122-133.
  15. Birgonul, M.T., Ozdogan (Dikmen), İ. and Arikan, M. (1998). “Cost of Poor Quality in Housing Projects”, Proceedings of XXVth IAHS World Housing Congress, Lisboa, Portugal, 29 June-3 July, pp.495-503.
  16. Birgonul, M.T. and Ozdogan, İ. (1998). “A Proposed Framework for Governmental Organizations in the Implementation of BOT Model”, Proceedings of ARCOM 1998 (Association of Researchers in Construction Management), Reading, England, 9-11 September, Vol.2, pp. 517-526.
  17. Birgonul, M.T., Kazaz, A. and Ozdogan (Dikmen), İ. (1999). “Investigation of Quality Related Problems in Mass Housing Projects”, Proceedings of XXVIth IAHS World Housing Congress, San Francisco, USA, 1-7 June, Vol.2, pp.575-583.
  18. Birgonul, M.T. and Ozdogan, İ. (1999). “Government Effects on the Turkish Construction Industry”, Joint Triennial Symposium, CIB Commissions W55 and W65, TG 31, Task Group on macroeconomic issues in construction industry, 5-10 September, Cape Town, South Africa, Vol.3, pp. 1044-1056.
  19. Birgonul, M.T. and Ozdogan, İ. (2000). “Competitiveness of Turkish Contractors in International Markets”, Proceedings of ARCOM 2000 (Association of Researchers in Construction Management), Glasgow Caledonian University, 6-8 September, UK, Vol.1, pp. 95-104.
  20. Birgonul, M.T. and Ozdogan (Dikmen), İ. (2000). “İşveren Kaynaklı Hızlandırmanın Süre ve Maliyet Analizi”, Advances in Civil Engineering, 4th International Congress, TRNC, Eastern Mediterranean University, 1-3 November, Vol. 4, pp. 1455-1466.
  21. Mohamed, A.N. and Birgonul, M.T. (2000). “Critical Review of Unit Price Escalation Methods Utilized in Different Public Projects”, Advances in Civil Engineering, 4th International Congress, TRNC, Eastern Mediterranean University, 1-3 November, Vol. 2, pp. 883-889.
  22. Birgonul, M.T. and Oztabak, S. (2000). “Critical Review of Construction Machinery Costs Within the Context of General Price Analysis”, Advances in Civil Engineering, 4th International Congress, TRNC, Eastern Mediterranean University, 1-3 November, Vol. 4, pp. 1475-1489.
  23. Birgonul, M.T. and Ozkan, N. (2000). “Karayolu Yatırımlarının Değerlendirilmesinde Kullanılan Fayda-Maliyet Analizi Sonuçlarının İrdelenmesi”, Advances in Civil Engineering, 4th International Congress, TRNC, Eastern Mediterranean University, 1-3 November, Vol. 4, pp. 1491-1501.
  24. Ozdogan Dikmen, and Birgonul, M.T. (2001). “Diversification Strategies of Turkish Construction Companies”, CIB World Building Congress 2001, NOV38, 2-6 April, Wellington, New Zealand.
  25. Birgonul, M.T. and Dikmen, İ. (2001). “Risks Borne by Foreign Contractors Doing Business in Turkey”, Proceedings of ARCOM 2001 (Association of Researchers in Construction Management), University of Salford, 5-7 September, UK, Vol.2, pp. 845-853.
  26. Dikmen, İ., Birgonul, M.T. and Artuk, U. (2002). “Türk İnşaat Sektöründe İnsan Kaynakları Yönetimi”, 5. Uluslararası İnşaat Mühendisliğinde Gelişmeler Kongresi, İTÜ, 25-27 September, İstanbul, Vol.3, pp. 325-334.
  27. Birgonul, M. T., Dikmen, İ. and Kızıltas, S. (2002). “Application of Quality Function Deployment (QFD) Methodology to Housing Projects”, 5th International Congress on Advances in Civil Engineering, İTÜ, 25-27 September, İstanbul, Vol.2, pp.1299-1308.
  28. Birgonul, M. T., Dikmen, İ. and Ataoglu, T. (2002). “Ortak Girişimlerde Kritik Başarı Faktörleri”, Uluslararası İnşaat Mühendisliğinde Gelişmeler Kongresi, İTÜ, 25-27 September, İstanbul, Vol.3, pp. 335-344.
  29. Birgonul, M.T., Dikmen, İ. and Ataoglu, T. (2002). “Organisational Learning as a Performance Driver in Construction Companies”, Proceedings of ARCOM 2002 (Association of Researchers in Construction Management), University of Northumbria, 2-4 September, UK, Vol.2, pp. 647-656.
  30. Dikmen, İ. and Birgonul, M.T. (2002). “An Investigation of the Factors that Affect International Market Entry Decisions”, COBRA 2002, The Nottingham Trent University, 5-6 September, UK, pp. 232-242.
  31. Kızıltas, S., Dikmen, İ. and Birgonul, M.T. (2003). “Organizational Effectiveness in Construction: A Conceptual Framework”, Proceedings of ARCOM 2003 (Association of Researchers in Construction Management), University of Brighton, 3-5 September, UK, Vol.2, pp. 523-532.
  32. Dikmen, İ., Birgonul, M.T. and Artuk, S.U. (2003). “Innovation in Construction: Evidence from Turkey”, Proceedings of the Joint International Symposium of CIB Working Commissions W55, W65 and W107, National University of Singapore, 22-24 October, Singapore, Vol.2, pp. 396-407.
  33. Dikmen, İ. and Birgonul, M.T. (2004). “Impact of Strategic Planning on Competitive Advantage: Evidence from Turkish Contractors”, Proceedings of the ASCE Specialty Conference on Leadership and Management in Construction, 24-26 March, Hilton Head, South Carolina, USA, pp. 201-211.
  34. Canga, E., Birgonul, M. T. and Dikmen, (2004). “The Impact of Graduate Construction Management Education on Professional Life”, Proceedings of the 4th Global Congress on Engineering Education, 5-9 July, Bangkok, Thailand, pp.151-154.
  35. Dikmen, İ., Birgonul, M.T. and Arikan, A.E. (2004). “A Critical Review of Risk Management Support Tools”, Proceedings of ARCOM 2004 (Association of Researchers in Construction Management), Heriot Watt University, 1-3 September, UK, Vol.2, pp. 1145-1154.
  36. Birgonul, M. T., Dikmen, İ., Kızıltas, S. and Artuk, U. (2004). “Organizational Effectiveness in Construction Companies: A Conceptual Framework”, 6th International Congress on Advances in Civil Engineering, Bogazici University, 6-8 October, İstanbul, Vol.3, pp.1931-1940.
  37. Birgonul, M. T., Dikmen, İ. and Ozorhon, B. (2004). “Case-Based Reasoning Applications in Construction Management”, 6th International Congress on Advances in Civil Engineering, Bogazici University, 6-8 October, İstanbul, Vol.3, pp.1941-1950.
  38. Ozorhon, B., Dikmen, İ. and Birgonul, M. T. (2005). “A Case-Based Reasoning Model as an Organizational Learning Tool”, CIB Symposium, Helsinki, Finland, Vol.7, pp.183-193.
  39. Birgonul, M.T., Dikmen, İ. and Demirel, T. (2005). “Decision Support Tool for the Quantification of Fault Rates in Construction Fall Accidents”, Proceedings of ARCOM 2005 (Association of Researchers in Construction Management), London, UK, 7-9 September, Vol.2, pp.1027-1036.
  40. Ozorhon, B., Dikmen, İ. and Birgonul, M.T. (2006). “International Market Entry Decisions: A Knowledge-Based Approach”, 1st International CIB Endorsed METU Postgraduate Conference, Ankara, Turkey, 17-18 March, pp.377-387.
  41. Dikmen, İ. and Birgonul, M. T. (2006). “A Review of Frameworks for Analyzing International Construction”, ASCE and CIB 2nd Speciality Conference on Leadership and Management in Construction and Engineering, Grand Bahama Island, Bahamas, 4-6 May, pp. 409-417.
  42. Dikmen, İ., Birgonul, M.T. and Arikan, A.E. (2006). “Application of an Integrated Risk Management System (IRMS) to an International Construction Project”, Proceedings of ARCOM 2006 (Association of Researchers in Construction Management), University of Central England, 4-6 September, Birmingham, UK, Vol.1, pp.153-163.
  43. Ozorhon, B., Dikmen, İ. and Birgonul, M.T. (2006). “Performance Indicators for International Joint Ventures: State of Knowledge”, CIB Joint International Symposium, Rome, Italy, 18-20 October.
  44. Isik, Z., Dikmen, İ. and Birgonul, M.T. (2006). “Critical Review of Performance Measurement Systems in the Construction Industry”, 7th International Congress on Advances in Civil Engineering, Yıldız Technical University, İstanbul, 11-13 October.
  45. Bu-Qammaz A., Dikmen, İ. and Birgonul M.T. (2006). “Cultural Risk Assessment in Construction Projects”, The Joint International Conference on Construction Culture, Innovation and Management (CCIM), Sustainable Development through Culture and Innovation, Dubai, United Arab Emirates, 26-29 November, pp.157-167.
  46. Dikmen, İ., Birgonul M.T., Tah, J.H.M. and Aouad, G. (2007). “A Learning Based Approach for Risk Management”, 1st Symposium on Towards the Foundation of Theory for the Built Environment, Salford, United Kingdom, 18-19 June, pp. 21-35.
  47. Dikmen, İ., Birgonul, M.T. and Atasoy, G., (2007). “Using Cognitive Maps for Risk Modelling in Construction Projects”, CME 25 Conference, Construction Management and Economics ‘Past, Present and Future’, University of Reading, United Kingdom, 16-18 July.
  48. Budayan, C., Dikmen, İ. and Birgonul T, (2007). “Strategic Group Analysis by Using Self Organizing Maps”, Proceedings of ARCOM 2007 (Association of Researchers in Construction Management), Belfast, UK, 3-5 September, Vol.1, pp.223-232.
  49. Isik, Z., Dikmen İ. and Birgonul, M.T. (2007). “Using Analytical Network Process (ANP) for Performance Measurement in Construction”, The Royal Institution of Chartered Surveyors, Proceedings of the COBRA 2007 Conference, Georgia Institute of Technology, Atlanta, Georgia, USA, 6-7 September, Paper Number 32.
  50. Dikmen, İ., Birgonul, M.T., Fidan, G. and Ozcan, G. (2008). “A Risk and Vulnerability Ontology for Construction Projects”, PM-04 – 4th SCPM and 1st IPMA/MedNet Conference Project Management Advances, Training and Certification in the Mediterranean”, 29-31 May 2008, Chios Island, Greece, pp.137-142.
  51. Soibelman, L., Akinci, B., Ozcan, G., Dikmen, İ. and Birgonul M.T. (2008). “International Collaborative Construction Management Course: A Teaching Case Study”, 5th International Conference on Innovation in Architecture, Engineering and Construction, 25-28 June 2008, Antalya, Turkey, Paper Number 24.
  52. Dikmen, İ., Birgonul M.T. and Ozorhon, B. (2008). “Using Cognitive Maps to Explore the Impact of International Contracting Experience on Competitiveness”, 5th International Conference on Innovation in Architecture, Engineering and Construction, 25-28 June 2008, Antalya, Turkey, Paper Number 27.
  53. Dikmen, İ., Birgonul M.T., Ozorhon, B. and Eren, K. (2008). “Critical Success Factors for Partnering in the Turkish Construction Industry”, in: Dainty, A (Ed), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK, Association of Researchers in Construction Management, 1013-1022.
  54. Dikmen, I., Birgonul, M.T. and Fidan, G. (2008). “Assessment of Project Vulnerability as a Part of Risk Management in Construction”, in: Carter, K., Ogunlana, S. and Kaka, A. (Editors), Proceedings of Joint 2008 CIB W065/W055 Symposium, 15-17 November 2008, Dubai, United Arab Emirates.
  55. Isik, Z., Arditi, D., Birgonul, M. T. and Dikmen, İ. (2009). “Impact of Organizational Competencies on Construction Project Performance” in: Ahmed, V., Alshawi, V., Egbu, C. and Sutrisna, M. (Editors), Proceedings of 9th International Postgraduate Research Conference, 29-30 January 2009, The Lowry, Salford Quays, Greater Manchester, U.K., 299-308.
  56. Budayan, C., Dikmen, İ. and Birgonul, M. T. (2009). “Modes of Differentiation Strategies in the Construction Industry”, in: Abbott, C., Aouad G., Kagioglou, M. and Pathmeswaran, R. (Editors), Proceedings of International Research Symposium, 27-28 January 2009, The Lowry, Salford Quays, Greater Manchester, U.K., 309-323.
  57. Ozorhon, B., Dikmen, İ. and Birgonul, M. T. (2009). “Structural Equation Modelling Applications in Construction Management”, in: Abbott, C., Aouad G., Kagioglou, M. and Pathmeswaran, R. (Editors), Proceedings of International Research Symposium, 27-28 January 2009, The Lowry, Salford Quays, Greater Manchester, U.K., 175-188.
  58. Budayan, C., Dikmen, I. and Birgonul, M. T. (2009). “Strategic Group Analysis by Using Fuzzy Clustering”, in: Birgonul, M. T., Azhar, S., Ahmed, S.M., Dikmen, I. and Budayan, C. (Editors), Proceedings of the Fifth International Conference on Construction in the 21st Century (CITC-V), 20-22 May 2009, Istanbul, Turkey, 245-252.
  59. Yiğit, M.A., Birgonul, M.T. and Dikmen, I. (2009). “Contract Management Behavior and Practices of Turkish Contractors at International Contracts”, in: Birgonul, M. T., Azhar, S., Ahmed, S.M., Dikmen, I. and Budayan, C. (Editors), Proceedings of the Fifth International Conference on Construction in the 21st Century (CITC-V), 20-22 May 2009, Istanbul, Turkey, 884-892.
  60. Isik, Z., Birgonul, M.T. and Dikmen, I. (2009). “Determinants of Glocal Success in International Construction”, in: Birgonul, M. T., Azhar, S., Ahmed, S.M., Dikmen, I. and Budayan, C. (Editors), Proceedings of the Fifth International Conference on Construction in the 21st Century (CITC-V), 20-22 May 2009, Istanbul, Turkey, 941-949.
  61. Soibelman, L., Akinci, B., Sacks, R., Dikmen, İ., Birgonul, M.T., Formoso, C. and Isatto, E. (2009). “Teaching Globalization Issues to Civil Engineering Students – The International Collaborative Construction Management Course”, in: Birgonul, M. T., Azhar, S., Ahmed, S.M., Dikmen, I. and Budayan, C. (Editors), Proceedings of the Fifth International Conference on Construction in the 21st Century (CITC-V), 20-22 May 2009, Istanbul, Turkey, 1104-1112.
  62. Arikan, A.E., Dikmen, İ. and Birgonul, M.T. (2009). “A Prototype Risk Management Decision Support Tool for Construction Projects”, in: Ceric, A. and Radujkovic, M. (Editors), Proceedings of the CIB Joint International Symposium 2009, 27-30 September 2009, Dubrovnik, Crotia, 885-895.
  63. Fidan, G., Dikmen, I. and Birgonul, M.T. (2010). “Using Multi Agent Systems in Construction Claim Negotiation”, in Computing in Civil and Building Engineering, Proceedings of the International Conference, W. Tizani (Editor), 30 June-2 July, Nottingham, UK, Nottingham University Press, Paper 146, p. 291.
  64. Isik, Z., Arditi, D., Birgonul, M.T. and Dikmen, İ. (2010). “A Strategic Performance Measurement Framework for the Construction Industry”, The Royal Institution of Chartered Surveyors, Proceedings of the COBRA Conference, Dauphine Université, 2-3 September, Paris, France.
  65. Dikmen, İ., Birgonul, T. and Eybpoosh, M. (2011). “Tracing Risk Paths in International Construction Projects: A Case Study”, in MISBE2011 – Proceedings of the International Conference on Management and Innovation for a Sustainable Built Environment, J.W.F. Wamelink, R. P. Geraedts, L. Volker (Editors), 19-23 June, Paper No:235, Amsterdam, The Netherlands.
  66. Yildiz, A.E.,  Dikmen, I., Birgonul, T., Ercoskun, K. and Salten, S. (2012). “A Risk Mapping Tool for Construction Projects”, Proceedings of the 14th International Conference on Computing in Civil and Building Engineering, 27-29 June, Moscow, Russian Federation.
  67. Ergin, T., Baltası, S., Erberik, M.A., Kurc, O., Ergen, E. and Birgonul, M.T. (2012). “Post-disaster Sensor-based Condition Assessment of Buildings to Develop Evacuation Strategies”, Proceedings of the 14th International Conference on Computing in Civil and Building Engineering, 27-29 June, Moscow, Russian Federation.
  68. Yildiz, A.E., Dikmen, I., Birgonul, M.T., Ercoskun, K. and Salten, S. (2012). “Risk Mapping in Construction Projects”, Working Paper Series, Proceedings of the Engineering Project Organization Conference, 10-12 July, Rheden, The Netherlands.
  69. Daneshvar, M., Dikmen, I. and Birgonul, M.T. (2012). “Investigation of Organizational Routines in Construction Companies”, Working Paper Series, Proceedings of the Engineering Project Organization Conference, 10-12 July, Rheden, The Netherlands.
  70. Ayhan, M., Guven, G., Ergen, E., Erberik, M.A., Kurc, O. and Birgonul, M.T. (2012). “Requirements of Indoor Navigation During Emergency Response and Disaster Management”, in: Ural, O., Sahin, M. and Ural, D. (Editors), Proceedings of the XXXVIII IAHS World Congress on Housing, 16-19 April, İstanbul Technical University, İstanbul, Turkey, 45-51.
  71. Guven, G., Ergen, E., Erberik, M.A., Kurc, O. and Birgonul, M.T. (2012). “Providing Guidance for Evacuation During Emergency Based on a Real-time Damage and Vulnerability Assessment of Facilities”, 2012 ASCE International Conference on Computing in Civil Engineering, 17-20 June, Florida, USA.
  72. Guven, G., Ayhan, M., Ergen, E., Sonmez, T., Kurc, O., Erberik, M.A. and Birgonul, M.T. (2012). “Representation of Topological Building Information for Creating Shortest Evacuation Paths During Building Emergencies”, th International Congress on Advances in Civil Engineering (ACE 2012), 17-19 October, Ankara, Turkey.
  73. Guven, G., Ergen, E., Ozbas, B., Erberik, M. A., Kurc, O. and Birgonul, M.T. (2013). “Multisensor Data Fusion for Determining Hallway Blockages in a Building during Evacuation”, in Proceedings of the 2013 ASCE International Workshop on Computing in Civil Engineering, June 23-25, Los Angeles, CA, USA, 717-724.
  74. Yildiz, A.E., Dikmen, I. and Birgonul, M.T. (2013). “Using Expert Opinion for Risk Assessment: A Case Study of a Construction Project Utilizing a Risk Mapping Tool”, Procedia – Social and Behavioral Sciences 119 (2014) 519-528, Proceedings of the 27th IPMA World Congress, 30 September-3 October 2013, Dubrovnik, Crotia.
  75. Ulubeyli, S., Kazaz, A., Er, B. and Birgonul, M.T. (2013). “Comparison of Different Roof Types in Housing Projects in Turkey: Cost Analysis”, Procedia – Social and Behavioral Sciences 119 (2014) 20-29, Proceedings of the 27th IPMA World Congress, 30 September-3 October 2013, Dubrovnik, Crotia.
  76. Bilgin, G., Dikmen, I. and Birgonul, M.T. (2014). “Ontology Evaluation: An Example of Delay Analysis”, Procedia Engineering 85 (2014) 61 – 68, Proceedings of Creative Construction Conference 2014, 21-24 June, Prague, Czech Republic, 144-149.
  77. Bilgin, G., Eken, G., Dikmen, I. and Birgonul, M.T. (2015). “A Relational Database for Construction Delay”, Proceedings of the Eighth International Conference on Construction in the 21st Century (CITC-8), 27-30 May 2015, Thessaloniki, Greece, 286-293.
  78. Ulubeyli, S., Sahin, S., Kazaz, A. and Birgonul, M.T. (2015). “Survival of Construction Companies in Crises through Process-Based Management”, Proceedings of the Eighth International Conference on Construction in the 21st Century (CITC-8), 27-30 May 2015, Thessaloniki, Greece, 651-658.
  79. Eken, G., Bilgin, G., Dikmen, I. and Birgonul, M. T. (2015). “A Lessons Learned Database Structure for Construction Companies”, Proceedings of Creative Construction Conference 2015, 21-24 June 2015, Krakow, Poland, 184-192.
  80. Gunduz M., Birgonul T. and Ozdemir, M. (2015). “A Fuzzy Structural Equation Model for Development of a Safety Performance Index”, Proceedings of the IIER 19th International Conference on Recent Innovations in Engineering and Technology, October 23, 2015, New York, USA, 26-30.
  81. Kazaz, A., Birgonul, M. T., Kaplan, H., Acıkara, T. and Er, B. (2016). “Evaluation of Consulting Firms Selection in Construction Projects by Using Fuzzy Logic”, Proceedings of the 2nd International Conference on Engineering and Natural Sciences (ICENS 2016), 24-28 May, Sarajevo, Bosnia and Herzegovina, pp. 423- 428.
  82. Kazaz, A., Birgonul, M. T., Acıkara, T. and Er, B. (2016). “Motivation as a Tool for Ensuring Productivity Improvement in Turkish Construction Industry”, Proceedings of the 2nd International Conference on Engineering and Natural Sciences (ICENS 2016), 24-28 May, Sarajevo, Bosnia and Herzegovina, 429- 433.
  83. Erol H., Dikmen I., and Birgonul M.T. (2017). “A Construction Delay Analysis Approach Based on Lean Principles”, In: LC3 2017 Volume II – Proceedings of the 25th Annual Conference of the International Group for Lean Construction (IGLC), Walsh, K., Sacks, R., Brilakis, I. (eds.), Heraklion, Greece, pp. 645–653. DOI: https://doi.org/10.24928/2017/0175
  84. Eken, G., Bilgin, G., Dikmen, I. and Birgonul, M. T. (2017). “Knowledge-Based Portfolio Management: A Taxonomy for Lessons Learned” ISEC-9: Resilient Structures and Sustainable Construction 24-29 July, ISEC PRESS, Valencia, Spain, C-13. DOI: 10.14455/ISEC.res.2017.13
  85. Ozyurt, B., Bilgin, G., Dikmen, I. and Birgonul, M. T. (2017). “Similarity Assessment of Countries to Facilitate Learning from International Construction Projects” ISEC-9: Resilient Structures and Sustainable Construction 24-29 July, ISEC PRESS, Valencia, Spain, C-10. DOI: 10.14455/ISEC.res.2017.12
  86. Dikmen, I. and Birgonul, M. T. (2017). “Incorporating Sustainability in Risk Assessment of Construction Projects”, Proceedings of the International Conference on Sustainable Futures-ICSF 2017, Ghassan Aouad, Assem Al-Hajj, Charles Egbu (eds.), 26-27 November, Kingdom of Bahrain, pp.123-130.
  87. Bilgin, G., Eken, G., Ozyurt, B., Dikmen, I., Birgonul, M. T. and Ozorhon, B. (2017). “Handling Project Dependencies in Portfolio Management”, Procedia Computer Science 121, 356–363, Proceedings of PROJMAN – International Conference on Project MANagement (2017), 8-10 November, Barcelona, Spain. https://doi.org/10.1016/j.procs.2017.11.048
  88. Erol, H., Dikmen, I., Atasoy Ozcan, G. and Birgonul, M. T. (2018). “Visualisation of Complexity and Risk in Mega Construction Projects”, Proceedings of the COBRA 2018 Conference, 23-24 April, London, UK.
  89. Bilgin, G., Eken, G., Ozyurt, B., Dikmen, I., Birgonul, M. T. and Ozorhon, B. (2018). “Construction Project Portfolio Management Tool (COPPMAN)”, Proceedings of the COBRA 2018 Conference, 23-24 April, London, UK.
  90. Dikmen, I. and Birgonul, M. T. (2018). “Assumption-Based Thinking for Project Risk Assessment”, Proceedings of the 16th Engineering Project Organization Conference, June 25-27, Brijuni, Croatia, 805-816.
  91. Mirshekarlou, B.R., Dikmen, I. and Birgonul, M. T. (2018). “An Investigation of the Most Waste-Prone Materials and Waste Causes in Prefabricated Steel Structure Building Projects”, Proceedings of the Creative Construction Conference (2018), 30 June – 3 July, Ljubljana, Slovenia,785-797.
  92. Kamali, S., Birgonul, M. T. and Dikmen, I. (2018). “Risk Identification in Public Private Partnership Projects”, Proceedings of the 5th International Project and Construction Management Conference (IPCMC 2018), 16-18 November, Girne, North Cyprus, pp. 901-913.
  93. Ozyurt, B., Bilgin, G., Dikmen, I. and Birgonul, M. T. (2018). “Clustering of Countries to Facilitate Knowledge Transfer between Similar Markets”, Proceedings of the 5th International Project and Construction Management Conference (IPCMC 2018), 16-18 November, Girne, North Cyprus, pp. 967-975.
  94. Erol, H., Dikmen, I., Atasoy, G. and Birgonul, M. T. (2018). “Contemporary Issues in Mega Construction Projects”, Proceedings of the 5th International Project and Construction Management Conference (IPCMC 2018), 16-18 November, Girne, North Cyprus, pp. 1022-1035.
  95. Dagkiran, G., Dikmen, I. and Birgonul, M. T. (2018). “Impact of Emerging Trends to Risk Management in Construction Projects”, Proceedings of the 5th International Project and Construction Management Conference (IPCMC 2018), 16-18 November, Girne, North Cyprus, pp. 1121-1128.
  96. Coskun, C., Dikmen, I. and Birgonul, M. T. (2018). “Critical Success Factors for Sustainable Construction of Mega Construction Projects”, Proceedings of the 5th International Project and Construction Management Conference (IPCMC 2018), 16-18 November, Girne, North Cyprus, pp. 1353-1362.
  97. Mohammadi, S., Birgonul, M. T. and Dikmen, I. (2018). “The Role of Contracting Strategy in Successful Outcome of Sustainable Projects in Turkish Architecture, Engineering and Construction (AEC) Industry”, Proceedings of the 5th International Project and Construction Management Conference (IPCMC 2018), 16-18 November, Girne, North Cyprus, pp. 1493-1502.
  98. Dikmen, I. and Birgonul, M. T. (2019). “Project Risk Conceptualization by Metaphors”, Proceedings of the PM Congress 2019, April 11-12, Delft, The Netherlands, 762-783, ISBN: 9789078271109.
  99. Bilgin, G., Eken, G, Ozyurt, B, Dikmen, I, Birgonul, M.T. and Ozorhon, B. (2019). “Validation of Support Tools for Project Management: Case of COPPMAN”, Proceedings of the Creative Construction Conference 2019 (CCC2019), 29 June-2 July, Budapest, Hungary, pp. 513-522.
  100. Kaya, F., Akcamete, A. and Birgonul, M.T. (2019). “An Investigation of Legal Aspects of BIM in Construction Contracts”, Proceedings of the International Civil Engineering & Architecture Conference, 17-20 April 2019, Trabzon, Turkey, Volume 1, pp. 214-220.
  101. Bilgin, G., Bilgin, P, Dikmen, I. and Birgonul, M.T. (2019). “Vision of the Turkish Construction Industry: A Comparative Qualitative Content Analysis of Strategic Roadmaps”, Proceedings of the International Conference on Innovation, Technology, Enterprise and Entrepreneurship ICITEE 2019, 26-27 November, Kingdom of Bahrain, pp. 3-12.
  102. Kamali, S., Birgonul, M. T. and Dikmen, I. (2020). “Conceptualization and Visual Representation of Uncertainty and Complexity Factors in Public-Private Partnership Projects”, Proceedings of the 6th International Project and Construction Management Conference (e-IPCMC2020), 12-14 November, Istanbul Technical University, Istanbul, Turkey, 348-358.
  103. Kaya, F., Akçamete, A. and Birgonul, M. T. (2020). “A Categorization of BIM-Related Legal Issues”, Proceedings of the 6th International Project and Construction Management Conference (e-IPCMC2020), 12-14 November, Istanbul Technical University, Istanbul, Turkey, 824-834.
  104. Bilgin, P., Dikmen, I. and Birgonul, M. T. (2020). “A Case Study of Using Innovation Catcher as an Innovation Performance Assessment Framework for Housing Projects”, Proceedings of the 6th International Project and Construction Management Conference (e-IPCMC2020), 12-14 November, Istanbul Technical University, Istanbul, Turkey, 1051-1061.
  105. Kaya, H.D., Dikmen, I., Atasoy, G. and Birgonul, M. T. (2020). “An Exploratory Study on Utilization of BIM for Risk Management”, Proceedings of the 6th International Project and Construction Management Conference (e-IPCMC2020), 12-14 November, Istanbul Technical University, Istanbul, Turkey, 1303-1317.
  106. Cakir, I., Kaya, H.D., Dikmen, I., Atasoy, G. and Birgonul, M. T. (2022). “An Exploratory Study on Communication Complexity in Mega Construction Projects”, CIB World Building Congress 2022, 27-30 June 2022, Melbourne, Australia, IOP Conf. Series: Earth and Environmental Science 1101 (2022) 042045 IOP Publishing, DOI1088/1755-1315/1101/4/042045
  107. Ozyurt, B., Birgonul, M. T. and Dikmen, I. (2022). “Using Web Crawling for Risk Assessment of International Construction Projects”, Proceedings of the 7th International Project and Construction Management Conference (IPCMC2022), 20-22 October, Yıldız Technical University, Istanbul, Turkey, 705-713.
  108. Erol, H., Dikmen, I., Atasoy, G. and Birgonul, M. T. (2022). “Integrated Risk Assessment Process (IRAP) for Mega Construction Projects: A Demonstrative Case Study”, Proceedings of the 7th International Project and Construction Management Conference (IPCMC2022), 20-22 October, Yıldız Technical University, Istanbul, Turkey, 1086-1098.
  109. Kamali, S., Birgonul, M. T. and Dikmen, I. (2022). “Resilience in Construction Projects: A New Approach to Manage Disruption”, Proceedings of the 7th International Project and Construction Management Conference (IPCMC2022), 20-22 October, Yıldız Technical University, Istanbul, Turkey, 1584-1596.
  110. Dikmen, I., Atasoy, G., Erol, H., Kaya, H.D. and Birgonul, M. T. (2022). “Project Risk Communication with Visualization”, Proceedings of the International Conference on the Leadership and Management of Projects in the digital age (IC:LAMP 2022), 27-28 November, Kingdom of Bahrain, 285-291.
  111. Ozyurt, B., Tah, J.H.M., Dikmen, I. and Birgonul M T. (2023). Using Web Crawling for Automated Country Risk Assessment, Proceedings of the 33rd European Safety and Reliability Conference (ESREL 2023), 3 – 7 September 2023, Southampton, UK, 2568 – 2572. 
  112. Eken, G., Dikmen, I. and Birgonul M T. (2023). Using NLP for Automated Contract Review and Risk Assessment, Proceedings of the 33rd European Safety and Reliability Conference (ESREL 2023), 3 – 7 September 2023, Southampton, UK, 2566 – 2567.

(NATIONAL)

BOOK

  1. Günay, G. and Birgönül, T. (2001). “Türk İnşaat Sektöründe Hukuksal Anlaşmazlıkların Oluşumu ve Çözüm Yolları”, Türkiye Müteahhitler Birliği Yayını.

CHAPTER IN A BOOK

  1. Balamir, M. and Birgönül, T. (1993). “Türkiye Koşullarına Uygun Konut Üretim Finans Modeli Araştırması”, ODTÜ Mimarlık Fakültesi Yayın No: 93.02, October 1993, s.143-222.

REFEREED PAPERS IN JOURNALS

  1. Birgönül, M.T. and Dikmen, İ. (1996). “İnşaat Projelerinin Risk Yönetimi”, TMMOB İnşaat Mühendisleri Odası, Teknik Dergi, Cilt 7, Sayı 4, October 1996, s.1305-1326.

REFEREED PAPERS IN CONFERENCE PROCEEDINGS

  1. Yeşilada, E., Özdoğan, Y. and Birgönül, M.T. (1991). “Tam Kesitinde Tünel Açma Makineleri; TBM’lerde Teknolojik Gelişmeler ve Uygulamalar”, TMMOB İnşaat Mühendisleri Odası, XI. Teknik Kongresi, İTÜ, İstanbul, 8-11 October, Cilt 2, s. 677-692.
  2. Yeşilada, E., Birgönül, M.T. and Özdoğan, Y. (1991). “Şantiyelerde Ağır İş Makinelerinin Kullanılmasında Verimi Etkileyen Faktörlerler, İş ve Zaman Etüdleri”, TMMOB İnşaat Mühendisleri Odası, XI. Teknik Kongresi, İTÜ, İstanbul, 8-11 October, Cilt 2, s. 704-717.
  3. Birgönül, M.T., Arıkan, S.M. and Dikmen, İ. (1995). “Yatırım Seçeneklerinin “Yaşam Dönemi Maliyeti” Açısından Analiz ve Yönetimi”, İnşaat Mühendisliğinde Gelişmeler, II. Teknik Kongre Bildiriler Kitabı, Boğaziçi Üniversitesi, İstanbul, 18-20 September, s. 579-587.
  4. Birgönül, M.T. and Dikmen, İ. (1995). “Yaşam Dönemi Maliyeti ve Risk Yönetimi”, İnşaat Mühendisliğinde Gelişmeler, II. Teknik Kongre Bildiriler Kitabı, Boğaziçi Üniversitesi, İstanbul, 18-20 September, s. 589-599.
  5. Birgönül, M.T. and Dikmen, İ. (1996). “Projelerin Değerlendirilmesinde Risk Analizi Yaklaşımı”, 1. Yapı İşletmesi Kongresi, 18-19 October, İzmir, s. 209-224.
  6. Birgönül, M.T., Arıkan, M. and Özdoğan (Dikmen), İ. (1997). “Malzeme Seçiminde Değer Yönetimi Yaklaşımı”, İnşaat Mühendisliğinde Gelişmeler (İMG’97), III. Teknik Kongre Bildiriler Kitabı, ODTÜ, Ankara, 15-16 September, Cilt 1, s. 209-217.
  7. Balas, C.E., Ergin, A. and Birgönül, M.T. (1997). “Kıyı Yapıları İnşaatlarının Benzeşim Yöntemi ile Planlanması”, İnşaat Mühendisliğinde Gelişmeler (İMG’97), III. Teknik Kongre Bildiriler Kitabı, ODTÜ, Ankara, 15-16 September, Cilt 3, s. 965-974.
  8. Ergin, A., Balas, C.E., Birgönül, M.T. and Ersarı, M. (1998). “Kıyı Yapıları Tasarımında Risk Parametresi Kullanılarak İnşaat Maliyetinin Modellenmesi”, Türkiye Kıyıları ’98, II. Ulusal Konferansı, 22-25 September, Ankara, s.785-793.
  9. Birgönül, T. and Özdoğan (Dikmen), İ. (2000). “Türk İnşaat Sektöründe Kritik Yol Yöntemi (KYY) Uygulamaları ve Karşılaşılan Sorunlar”, 2. Yapı İşletmesi Kongresi, Ege Üniversitesi, 15-17 June, İzmir, s.31-42.
  10. Özdoğan (Dikmen), İ. And Birgönül, T. (2000). “İnşaat Sektöründe Strateji Yönetimi”, 2. Yapı İşletmesi Kongresi, Ege Üniversitesi, 15-17 June, İzmir, s.139-151.
  11. Ergin, A., Birgönül, M.T., Balas, C. and Önder, M.B. (2000). “Kıyı Yapılarının Proje Yönetiminde Güvenilirliğe Dayalı Risk Değerlendirme Üzerine Karşılaştırmalı Bir Çalışma”, III. Ulusal Kıyı Mühendisliği Sempozyumu, 5-7 October, Çanakkale, s. 131-142.
  12. Birgönül, M.T. and Dikmen, İ. (2001). “Türk İnşaat Sektörünün Rekabet Analizi”, TMMOB İnşaat Mühendisleri Odası, XVI. Türkiye İnşaat Mühendisliği Teknik Kongresi ve Sergisi, ODTÜ, 1-3 November, Ankara.
  13. Birgönül, M.T. and Günay, G. (2001). “Türk İnşaat Sektöründe Hukuksal Anlaşmazlıkların Oluşumu ve Nitelikleri”, TMMOB İnşaat Mühendisleri Odası, XVI. Türkiye İnşaat Mühendisliği Teknik Kongresi ve Sergisi, ODTÜ, 1-3 November, Ankara.
  14. Dikmen, İ., Birgönül, M.T., Ataoğlu, T. and Özorhon, B. (2004). “Türk İnşaat Şirketlerinde Kurumsal Öğrenme: Mekanizmalar ve Kültürel Engeller”, TMMOB İnşaat Mühendisleri Odası, XVII. Türkiye İnşaat Mühendisliği Teknik Kongresi ve Sergisi, Yıldız Teknik Üniversitesi, 15-17 April, İstanbul, s. 555-557.
  15. Birgönül, M.T., Dikmen, İ., Demirel, T. and Arıkan, A.E. (2005). “Yapım Yönetiminde Çağdaş Eğilimler ve Güncel Araştırma Konuları”, 3. Yapı İşletmesi Kongresi, 29-30 September, İzmir, s. 13-31.
  16. Arıkan, A.E., Dikmen, İ. And Birgönül, M.T. (2005). “Bütünleşik Bir Risk Yönetim Karar Destek Sistemi”, 3. Yapı İşletmesi Kongresi, 29-30 September, İzmir, s. 90-101.
  17. Dikmen, İ., Birgönül, M.T. and Özorhon, B. (2005). “Uluslararası Pazar Seçiminde Bir ANP (Analytic Network Process) Uygulaması”, 3. Yapı İşletmesi Kongresi, 29-30 September, İzmir, s. 162-171.
  18. Sönmez, R., Ergin, A. and Birgönül, M.T. (2005). “Uluslararası Projelerde Risk Primini Etkileyen Faktörlerin Belirlenmesi”, 3. Yapı İşletmesi Kongresi, 29-30 September, İzmir, s. 425-431.
  19. Budayan, C., Dikmen, İ. and Birgönül, M.T. (2007). “Türk İnşaat Sektöründe Stratejik Grup Analizi”, 4. İnşaat Yönetimi Kongresi, 30-31 October, İstanbul, s.139-148.
  20. Birgönül, M.T., Dikmen, İ., Özorhon, B. and Işık, Z. (2007). “İnşaat Sektörünün Yapım Yönetimi Eğitiminden Beklentileri”, 4. İnşaat Yönetimi Kongresi, 30-31 October, İstanbul, s.169-179.
  21. Dikmen, İ., Birgönül, M.T., Eybpoosh, M., Fidan, G. and Karakaş, K. (2010). “Çok Aracılı Maliyet Tahmin ve Risk Paylaşım Sistemi”, 1. Proje ve Yapım Yönetimi Kongresi, 29 September-1 October, Ankara, 643-654.
  22. Dikmen, İ., Birgönül, M.T. and Özer, A.H. (2010). “Bütünleştirilmiş Süre – Maliyet Etki Ağı ile Aktivite Bazlı Bir Risk Değerlendirme Modeli”, 1. Proje ve Yapım Yönetimi Kongresi, 29 September-1 October, Ankara, 977-988.
  23. Işık, Z., Arditi, D., Birgönül, M.T., and Dikmen, İ. (2010). “Yapım Sektörü’nde Performans Ölçümü için Kavramsal Bir Model”, 1. Proje ve Yapım Yönetimi Kongresi, 29 September-1 October, Ankara, 1008-1019.
  24. Dikmen, İ., Birgönül, M.T. and Arıkan, A.E. (2010). “Uluslararası İnşaat Projeleri için Bütünleşik bir Risk Yönetim Modeli ve Yazılımı”, 1. Proje ve Yapım Yönetimi Kongresi, 29 September-1 October, Ankara, 1102-1112.
  25. Ayhan, M., Ergan, S., Güven, G., Ergen, E., Erberik, M.A., Kurç, Ö. and Birgönül, M.T. (2012). “Bina İçi Yönlendirme Sistemlerinde Kullanılan En Kısa Yol Algoritmalarının Afet ve Acil Durum Yönetimi Açısından Değerlendirilmesi”, 2. Proje ve Yapım Yönetimi Kongresi, 13-16 September, İzmir Yüksek Teknoloji Enstitüsü, Urla-İzmir, 329-340.
  26. Yıldız, A.E., Dikmen, I., Birgönül, M.T., Ercoşkun, K. and Salten, S. (2012). “İnşaat Projeleri İçin Bilgi-Tabanlı Risk Haritalama Aracının Geliştirilmesi”, Proje ve Yapım Yönetimi Kongresi, 13-16 September, İzmir Yüksek Teknoloji Enstitüsü, Urla-İzmir, 1117-1129.
  27. Budayan, C., Dikmen, İ. and Birgönül, M.T. (2012). “Avrupa Ülkeleri Arasındaki İnşaat Maliyetlerinin Kıyaslanmasına Yönelik Bir Kümeleme Analizi”, Proje ve Yapım Yönetimi Kongresi, 13-16 September, İzmir Yüksek Teknoloji Enstitüsü, Urla-İzmir, 1189-1200.
  28. Sakın, A., Birgönül, M.T. and Dikmen, İ.(2012). “Yurtdışı Müteahhitlik Hizmetlerinde, Geçmişten Edinilen Derslerin Işığında Geleceğe Yönelik Öneriler”, 2. Proje ve Yapım Yönetimi Kongresi, 13-16 September, İzmir Yüksek Teknoloji Enstitüsü, Urla-İzmir, 1461-1474.
  29. Bilgin, G., Birgönül, M.T. and Dikmen, İ. (2014). “İnşaat Projeleri için Gecikme Analizi: Gecikme Nedenleri ve Önleyici Tedbirlerinin Taksonomisi”, 3. Proje ve Yapım Yönetimi Kongresi, 6-8 November, Antalya, 339-350.
  30. Erol, H., Eken, G., Bilgin, G., Dikmen, İ. and Birgönül, M.T. (2014). “Yalın İnşaat Uygulamalarının 4-Boyutlu Model ile Gösterimi”, 3. Proje ve Yapım Yönetimi Kongresi, 6-8 November, Antalya, 351-362.
  31. Bilgin, G., Yıldız, A. E., Erol, H., Dikmen, İ., Birgönül, M.T. and Özorhon, B. (2014). “İnşaat Projeleri için bir Portföy Yönetim Aracının Geliştirilmesi”, 3. Proje ve Yapım Yönetimi Kongresi, 6-8 November, Antalya, 363-375.
  32. Bilgin, G., Eken, G., Özyurt, B., Dikmen, İ., Birgönül, M.T. and Özorhon, B. (2016). “İnşaat Şirketleri İçin bir Proje Portföy Yönetim Aracı: COPPMAN”, Proje ve Yapım Yönetimi Kongresi, 3-5 November, Eskişehir, 233-245.
  33. Özyurt, B., Bilgin, G., Eken, G., Dikmen, İ. and Birgönül, M.T. (2016). “İnşaat Projelerinde Öğrenme: Benzerlik Değerlendirmesi için Kümeleme Analizi”, Proje ve Yapım Yönetimi Kongresi, 3-5 November, Eskişehir, 246-257.
  34. Erol, H., Özyurt, B., Bilgin, G., Atasoy Özcan, G., Birgönül, M.T. and Dikmen, İ. (2016). “Lazer Tarayıcı Uygulamalarında Planlama: Bir Vaka Çalışması”, Proje ve Yapım Yönetimi Kongresi, 3-5 November, Eskişehir, 742-756.
  35. Ayhan, M., Birgönül, M.T. and Dikmen, İ. (2016). “İnşaat Sözleşmelerinde Ortaya Çıkması Olası Uyuşmazlıkların Tahmin Edilmesi Üzerine Alternatif bir Yaklaşım”, Proje ve Yapım Yönetimi Kongresi, 3-5 November, Eskişehir, 1055-1066.
  36. Mohammadi, S., Birgönül, M.T. and Dikmen, İ. (2016). “Enerji Verimliliği Perspektifinden Türk İnşaat Sektörüne Bakış”, Proje ve Yapım Yönetimi Kongresi, 3-5 November, Eskişehir, 1237-1246.

Prof. Dr. M. Talat Birgönül

M. Talat Birgönül